My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
502
>
2900 - Site Mitigation Program
>
PR0528085
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 3:32:20 PM
Creation date
1/22/2020 3:21:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528085
PE
2959
FACILITY_ID
FA0019016
FACILITY_NAME
PG&E TRACY SERVICE CENTER
STREET_NUMBER
502
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
502 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHARP Management Manual <br /> •� • Former Tracy MGP Project Safety Plan (PSP) <br /> SECTION 4 -ADMINISTRATIVE PHASE <br /> 4. 1 PROJECT SAFETY COMMITTEE <br /> Depending on the size and type of project, a safety committee that includes representation from <br /> all project stakeholders shall be formed. If the project has less than five (5) Parsons' employees <br /> or 25 subcontractors, then a Project Safety Committee will be handled at the Program or Facility <br /> level. The Program or Facility Health and Safety (H&S) Representative is responsible for <br /> communicating information from the Division Safety Manager conference call with the project <br /> personnel on a monthly basis. Review of the meeting minutes from the Division Safety Manager <br /> conference call will take place on the first Thursday of every month at times and locations to be <br /> determined and posted by the Project Manager on the safety billboard at least one week in <br /> advance. <br /> Due to the size of this project (less than 5 Parsons' employees and less than 25 subcontractors), <br /> the Project Safety Committee will be handled at the Program level. <br /> 4.2 PROJECT ORIENTATION <br /> The Project Safety Representative meets with new workers to review site procedures and <br /> requirements listed in the PSP Orientation. Topics covered in the PSP orientation include: <br /> • Names of personnel responsible for site safety and health <br /> • Reporting emergencies, incidents and unsafe conditions <br /> • Emergency/evacuation plans <br /> • Safety,health and other hazards at the site <br /> • Review of all activities on site and related Activity Hazard Analyses(AHAs) <br /> • Proper use of personal protective equipment <br /> • Work practices by which a worker can minimize risk from hazards <br /> • Safe use of engineering controls and equipment on site <br /> • Acute effects of compounds at the site <br /> • Decontamination procedures <br /> All personnel, including subcontractors and visitors, on a project must receive a PSP orientation <br /> prior to starting work or accessing the site and sign an acknowledgment form indicating they <br /> received and understood the orientation. Any individual who is unsure of any information <br /> presented in the orientation must request clarification. Individuals who do not participate in the <br /> orientation or refuse to sign the acknowledgment cannot work on or access the site. <br /> 4.3 AWARENESS CAMPAIGN <br /> The project has established an awareness program consistent with the Parsons' safety awareness <br /> campaign and its various elements (e.g., signs, posters, banners, and focus briefings). This <br /> program promotes worker awareness of safety goals and daily risks, hazards, and exposures in <br /> the field. In addition to topics selected by corporate safety each month, the project will <br /> supplement the awareness program with information specifically applicable to the scope of work. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.