Laserfiche WebLink
also comply with the SJCDEH requirements and DTSC guidelines for well decommissioning <br /> (DTSC, 1995). <br /> 4.0 REFERENCES <br /> Department of Toxic Substances Control (DTSC), 1995. Monitoring Well Design and <br /> Construction for Hydrogeologic Characterization. July. <br /> DTSC, 2013. Approval of Final Removal Action Completion Report for Operable Unit I (Soil) <br /> and No Further Action Determination for APN 250-27-008, Former PG&E <br /> Manufactured Gas Plant Site, Tracy, California. May 30. <br /> DTSC, 2014. Approval of Request for Operable Unit 2 Closure, Former Tracy Manufactured <br /> Gas Plant Site, Tracy, California. August 7. <br /> Department of Water Resources, 1990. DWR Bulletin 74-90:Supplement to DWR Bulletin 74-81, <br /> Water Well Standards, State of California, December 1981. June. <br /> Parsons, 2010. Remedial Investigation Report for the Former Tracy Manufactured Gas Plant. <br /> February 5. <br /> Parsons, 2011. Results for the Supplemental Geotechnical and Environmental Site Investigation. <br /> May 5. <br /> Parsons, 2012a. Monitoring Well Completion Report, Former Tracy MGP Site, 502 E. Grant <br /> Line Rd., Tracy, CA.July 11. <br /> Parsons, 2012b. Groundwater Well Installation, Monitoring and Remediation Workplan. <br /> April 18. <br /> Parsons, 2014. Ninth Quarterly (Q9) Groundwater Monitoring Report and Operable Unit 2 <br /> Closure Request, Former Tracy MGP Site, Tracy, CA. April 18. <br /> PG&E, 1986. Preliminary Assessment of the Former Manufactured Gas Plant Site in the City of <br /> Tracy(Site No. SQ-SK-TRA),prepared by PG&E,December. <br /> PG&E, 1989. Site Investigation for the Former Manufactured Gas Plant Site at Tracy, <br /> California (SQ-SK-TRA), prepared by PG&E,April. <br /> 7 <br />