My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
502
>
2900 - Site Mitigation Program
>
PR0528085
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 3:32:20 PM
Creation date
1/22/2020 3:21:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528085
PE
2959
FACILITY_ID
FA0019016
FACILITY_NAME
PG&E TRACY SERVICE CENTER
STREET_NUMBER
502
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
502 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nae : 0 • <br /> SHARP Management Manual <br /> Former Tracy MGP Project Safety Plan (PSP) <br /> 6.4 SAFETY SYSTEMS ANALYSIS <br /> GBU Safety Managers use the safety systems analysis for field staff and subcontractors whose <br /> work requires that they be on site for over six months. The analysis provides management with a <br /> rating that reflects the safety and health program effectiveness. Appendix Bl to the SHARP <br /> Management manual provides the program, protocol, and methodology. <br /> 6.5 SITE INSPECTION <br /> The remediation site inspection is a protocol designed to identify and correct unsafe acts and <br /> conditions, as well as recognize safe work practices and accomplishments, in Parsons or <br /> subcontractors' scope of work. The Project Manager or Project Safety Manager should develop <br /> standard safety checklists appropriate to the work being performed. Exhibit 6.3 is an example of <br /> a simple checklist to evaluate a project's status. The Project Manager shall develop a checklist <br /> based on questions from the audit programs in Appendix B of the SHARP Manual. <br /> Inspections involve a daily or weekly walk around of a project site that focuses on safety. The <br /> Project Manager or Project Engineer responsible for the work conducts inspections, accompanied <br /> by the Project Safety Manager as necessary. Daily site walks do not have to be documented,but <br /> once a week the Project Manager prepares an inspection report using Exhibit 6.3 and forwards it <br /> to the Project Safety Manager for maintaining in the project file. Items found to be out of <br /> compliance must be assigned to the responsible party for corrective action and the corrective <br /> action tracked to completion. Subcontractors shall be advised of noncompliance items using a <br /> Notice of Subcontractor Violation, included as Exhibit 6.4. <br /> 6.6 DAILY SITE WALK CHECKLIST <br /> Depending on the scope of work, type of activities (i.e. low risk versus high risk) and duration of <br /> the project, the Project Manager or their designee shall conduct a daily safety site walk using the <br /> Remediation Safety and Health Inspection Checklist in Exhibit 6-3 to identify problem areas. <br /> Items found to be out of compliance must be assigned corrective action and the corrective action <br /> tracked to completion. <br /> 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.