Laserfiche WebLink
7' SHARP Management Manual <br /> Qa4soN�s Former Tracy MGP Project Safety Plan (PSP) <br /> Exhibit 6-3: Remediation Safety and Health Inspection Checklist <br /> Project: Date: <br /> Inspector: Time: <br /> Any items that have been found deficient must be corrected before work or use. <br /> This checklist includes,but is not limited to, the following: <br /> Yes No <br /> Safe Access and Workspace <br /> Are safe access and adequate space for movement available for: <br /> Work area <br /> Walkways and passageways <br /> Are ladders,stairways,and elevators properly located and functioning? <br /> Is protection provided for excavations and trenches? <br /> Is overhead protection provided for all areas of exposure? <br /> Planning Work for Safety <br /> Are employees provided with all required personal protective equipment(PPE)? <br /> Have other contractors and trades been coordinated with to prevent congestion and avoid <br /> hazards? <br /> Is air monitoring necessary to determine whether any chemical exposure exists? <br /> Utilities and Services Identification <br /> Have all utilities been identified by signs/markout? <br /> Have high voltage lines been moved or de-energized,or barriers erected to prevent employee <br /> contact? <br /> Sanitary Facilities <br /> Is drinking water available? <br /> Are toilet facilities adequate? <br /> Work Procedures—Materials Handling <br /> Is material handling space adequate? <br /> Is material handling equipment adequate and proper? <br /> Is material handling equipment in good condition? <br /> Are workers properly trained to operate equipment and handle hazardous materials? <br /> Comments: <br /> 32 <br />