My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
502
>
2900 - Site Mitigation Program
>
PR0528085
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 3:32:20 PM
Creation date
1/22/2020 3:21:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528085
PE
2959
FACILITY_ID
FA0019016
FACILITY_NAME
PG&E TRACY SERVICE CENTER
STREET_NUMBER
502
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
502 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§� @b SHARP Management Mamua! <br /> Former Tracy MGP Project Safety Plan (PSP) <br /> Exhibit 6.4—Notice of Subcontractor Violation of Safety and Health Regulations(Continued) <br /> PARSONS <br /> Notice of Violation with Safety and Health Regulations <br /> Under conditions of this enforcement procedure check all items that apply: <br /> — 1. You are being notified of this violation and should take corrective action to prevent a reoccurrence.The corrective <br /> action shall be documented to the Parsons Construction Management representative immediately. <br /> — 2. You must submit a plan for compliance to your Parsons Construction Management representative and the <br /> Construction Safety Manager within two days of receipt of this letter.The compliance plan must include the means <br /> or methods of compliance and the date that the requirements for compliance will be completed.Once compliance <br /> has been achieved,a follow up letter must be sent to the Parsons Construction Management representative and <br /> Construction Safety Manager.Failure to comply will result in disciplinary action against your Company. <br /> — 3. You are required to review the stated procedures with your Parsons Construction Management representative. <br /> Work may not commence on the site until the review is complete and the Subcontractor responds formally that the <br /> procedure is understood and will comply. <br /> 4. You are required to review the stated procedures with your Parsons Construction Management representative. <br /> Work may not commence on the site until the review is complete and you must confirm formally the disciplinary <br /> action to be taken against the supervisor and employees. <br /> 5. All work on the site will stop until the Parsons Construction Management representative reviews all the facts with <br /> the Subcontractor and determines if the contract between the parties will be terminated. <br /> Sincerely, <br /> Parsons Representative <br /> cc: Issuing Construction Manager Representative <br /> Job File <br /> GBU Safety Manager <br /> Project Manager <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.