My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
502
>
2900 - Site Mitigation Program
>
PR0528085
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 3:32:20 PM
Creation date
1/22/2020 3:21:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528085
PE
2959
FACILITY_ID
FA0019016
FACILITY_NAME
PG&E TRACY SERVICE CENTER
STREET_NUMBER
502
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
502 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V �• SHARP Management Manual <br /> r / <br /> Former Tracy MGP Project Safety Plan(PSP) <br /> • Only qualified operators will be allowed to operate heavy equipment, per safe work <br /> guidelines included in the OSHA General Industry(29 CFR 1910)and Construction <br /> Industry(29 CFR 1926)standards. <br /> • Site work should be performed during daylight hours whenever possible. Work conducted <br /> during hours of darkness require enough illumination intensity to read a newspaper <br /> without difficulty. Working at night requires prior notification of the Facility Health and <br /> Safety Representative. <br /> • Common paths of travel should be established and kept free from the accumulation of <br /> materials. <br /> Slips,Trips, and Falls . Provide slip-resistant surfaces, ropes, and/or other devices to be used. <br /> • Specific areas should be designated for the proper storage of materials. Tools, equipment, <br /> materials, and supplies will be stored in an orderly manner. <br /> • As work progresses, scrap and unessential materials must be neatly stored or removed <br /> from the work area. Containers for trash and other debris will be provided and will be <br /> removed at regular intervals. <br /> • All spills will be quickly cleaned up. Oil and grease will be cleaned from walking and <br /> working surfaces. <br /> • Handle containers carefully to reduce the potential for glass breakage <br /> • Wear gloves to minimize the potential for chemicals on the outside of packages to contact <br /> Packing sample for the skin. <br /> off-site shipment to lab • Use bubble wrap or other appropriate material to pad and or encapsulate containers to <br /> minimize potential for glass breakage. <br /> Training Requirements: <br /> All assigned employees are required to familiarize themselves with the contents of this AHA before starting a work activity and review it with their Supervisor during their <br /> Daily Safety Huddle. <br /> A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.