Laserfiche WebLink
y�m <br /> SHARP Mana ementManual <br /> �wao•� Former Tracy MGP Project Safety Plan(PSP) <br /> Activity Hazards Analysis <br /> Page_of <br /> Project Name&Number:PG&E Former AHA No. Date: 10/6/2006 New: <br /> Tracy MGP Site <br /> Location: Tracy,CA Contractor:xxx Revised: <br /> Required Personal Protective Equipment Analysis by:Thomas Blaney Date:7/30/2007 <br /> Level D Modified/Respiratory protection • <br /> if required based on monitoring results <br /> Superintendent/Competent Person: Reviewed by: Date: <br /> Thomas Blaney <br /> Work Task/Activity:Excavation/working Approved by: Date: <br /> near drill rig <br /> Hazards Preventive or Corrective Measures <br /> • Only qualified operators will be allowed to operate heavy equipment,per safe work guidelines included in the OSHA General <br /> Industry(29 CFR 1910)and Construction Industry(29 CFR 1926)standards. <br /> Equipment • Personnel will never walk directly behind or to the side of operating equipment without the operator's knowledge. <br /> Operation • Do not wear loose-fitting clothing or other items such as rings or watches that could get caught in moving parts. Long hair will <br /> be restrained. <br /> • Store excavated spoils>3 feet from excavation edge <br /> • Inspect daily by Excavation Competent person for slope stability <br /> Open . Remove any ponding water/maintain dust control measures as necessary <br /> excavations <br /> • Store excavated spoils>3 feet from excavation edge <br /> • Follow Parsons Pre-Digging Protocol. <br /> • All vehicles used at the site,including personal and rental vehicles,must be inspected and decontaminated prior to leaving site. <br /> Vehicle Traffic • Use proper traffic control(cones,advance warning signs)when blocking traffic lanes or shoulders <br /> • Wear an orange traffic safety vest when working around heavy equipment or near vehicular traffic. <br /> A-3 <br />