My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002230
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0542420
>
ARCHIVED REPORTS_XR0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 10:11:18 AM
Creation date
1/23/2020 9:28:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002230
RECORD_ID
PR0542420
PE
2960
FACILITY_ID
FA0024376
FACILITY_NAME
FORMER CHEVRON 98632
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 Twenty-four (24) hours advance notice of intent to conduct geophysical logging <br /> ' 3 Twenty-four(24) hours advance notice of intent to obtain water samples <br /> 4 Twenty-four(24) hours advance notice of intent to conduct the caliper logs <br /> 5 Forty-eight (48) hours advance notice of scheduling the installation of casing, <br /> screens, and filter material in the production wells <br /> ' 6 Forty-eight (48) hours advance notice of scheduling the installation of the grout <br /> sanitary seals Also, the Contractor is responsible for notifying the appropriate <br /> ' regulatory personnel the required time prior to placing the grout seals <br /> 7 Twenty-four(24) hours advance notice of scheduling development and testing of <br /> the completed production wells <br /> ' 8 Twenty-four (24) fours advance notice of performing the test for sand content after <br /> development of the production wells <br /> 9 Twenty-four (24) hours advance notice of scheduling the plumbness and alignment <br /> test in the production wells <br /> 1 10 If operations are suspended by the Contractor for any reason, notice shall be given I <br /> at that time stating the reason for suspension, notice also shall be given before <br /> work is resumed <br /> SECTION 37— LICENSES. PERMITS AND REPORTS <br /> The Contractor shall possess a valid C-57 California Contractor's license and shall at his <br /> own expense procure all permits and licenses required of him by law for the execution of <br /> ' his work, including drilling permits from the County of San Joaquin, Environmental <br /> Health Department Contractor shall have in his possession, at the fob sites, all required <br /> drilling permits Contractor shall comply with all State and local laws, ordinances, and <br /> rules and regulations relating to the performance of the work and shall file all reports as <br /> required by the State and local agencies in connection with the well drilling within 30 <br /> days of the wells' completion Copies of all reports shall be sent to the Engineer <br /> SECTION 38— EXECUTION <br /> ' All work shall be performed as specified and in accordance with applicable sections of <br /> California Department of Water Resources Bulletin 74-81 "Water Well Standards" State <br /> of California and its supplement Bulletin 74-90 Should the Contractor discover any <br /> discrepancies between the Specifications and State/Local requirements, the Contractor <br /> shall bring them to the attention of the Engineer immediately <br /> ' END OF SECTION <br /> 1 <br /> ' August 2001 Division 11 -16 Ball Park& Park & Ride Wells Ph 1 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.