Laserfiche WebLink
2 Twenty-four (24) hours advance notice of intent to conduct geophysical logging <br /> ' 3 Twenty-four(24) hours advance notice of intent to obtain water samples <br /> 4 Twenty-four(24) hours advance notice of intent to conduct the caliper logs <br /> 5 Forty-eight (48) hours advance notice of scheduling the installation of casing, <br /> screens, and filter material in the production wells <br /> ' 6 Forty-eight (48) hours advance notice of scheduling the installation of the grout <br /> sanitary seals Also, the Contractor is responsible for notifying the appropriate <br /> ' regulatory personnel the required time prior to placing the grout seals <br /> 7 Twenty-four(24) hours advance notice of scheduling development and testing of <br /> the completed production wells <br /> ' 8 Twenty-four (24) fours advance notice of performing the test for sand content after <br /> development of the production wells <br /> 9 Twenty-four (24) hours advance notice of scheduling the plumbness and alignment <br /> test in the production wells <br /> 1 10 If operations are suspended by the Contractor for any reason, notice shall be given I <br /> at that time stating the reason for suspension, notice also shall be given before <br /> work is resumed <br /> SECTION 37— LICENSES. PERMITS AND REPORTS <br /> The Contractor shall possess a valid C-57 California Contractor's license and shall at his <br /> own expense procure all permits and licenses required of him by law for the execution of <br /> ' his work, including drilling permits from the County of San Joaquin, Environmental <br /> Health Department Contractor shall have in his possession, at the fob sites, all required <br /> drilling permits Contractor shall comply with all State and local laws, ordinances, and <br /> rules and regulations relating to the performance of the work and shall file all reports as <br /> required by the State and local agencies in connection with the well drilling within 30 <br /> days of the wells' completion Copies of all reports shall be sent to the Engineer <br /> SECTION 38— EXECUTION <br /> ' All work shall be performed as specified and in accordance with applicable sections of <br /> California Department of Water Resources Bulletin 74-81 "Water Well Standards" State <br /> of California and its supplement Bulletin 74-90 Should the Contractor discover any <br /> discrepancies between the Specifications and State/Local requirements, the Contractor <br /> shall bring them to the attention of the Engineer immediately <br /> ' END OF SECTION <br /> 1 <br /> ' August 2001 Division 11 -16 Ball Park& Park & Ride Wells Ph 1 <br /> i <br />