My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002230
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0542420
>
ARCHIVED REPORTS_XR0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 10:11:18 AM
Creation date
1/23/2020 9:28:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002230
RECORD_ID
PR0542420
PE
2960
FACILITY_ID
FA0024376
FACILITY_NAME
FORMER CHEVRON 98632
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B The pea gravel shall be uniformly graded from coarse to fine with a maximum <br /> particle size of 314 inch, a maximum of 50% passing a No 4 sieve, and a <br /> maximum of 15% passing a No 200 sieve <br /> C The sand shall be uniformly graded from coarse to fine, with a maximum particle <br /> size of 318 inch, a maximum of 50% passing a No 30 sieve, and a maximum of <br /> 15% passing a No 200 sieve <br /> 202 BENTONITE SEALS <br /> Form bentonite seals placed during isolated water quality sampling with bentonite <br /> pellets <br /> PART 3 - EXECUTION <br /> 3 01 SAMPLING <br /> Execute the sampling as follows <br /> A The Contractor shall fill the test holes with native material and bentonite tablets <br /> to within five (5) feet of the depth of the bottom of the first (lowest) strata <br /> ' selected for testing Bentonite and fill material shall be installed by tremle to the <br /> bottom of the hole Said depth shall be sounded to confirm the hole has been <br /> filled to the proper level <br /> B The Contractor shall then lower a 6-inch diameter, sampling string with a twenty- <br /> foot (20') perforated pipe to the proper depth for developing the test strata After <br /> placement of the perforated pipe, the Contractor shall fill the test hole with pea <br /> gravel to a level twenty feet (20') above the top of the perforated piping The <br /> volume of gravel placed shall be measured and compared to the theoretical <br /> volume required The well shall be sounded to measure the depth to the top of <br /> the gravel pack The Contractor shall then place a ten-foot (10') minimum, <br /> impervious layer of bentonite on top of the gravel pack to isolate the test strata <br /> using a tremae pipe <br /> C The Contractor shall then develop the test strata by air lifting for a period of 24 <br /> hours or until the following conditions, as determined by the Engineer, have been <br /> met <br /> 1 Water being pumped becomes clear to the eye <br /> 2 The electrical conductivity and pH of the water have stabilized <br /> D Once these conditions have been fulfilled, water samples of the isolated zone <br /> shall be taken as described below <br /> 1 Because chemical constituents with known volatility will be sampled and <br /> tested, a 4-inch submersible pump shall be used for obtaining the water <br /> sample <br /> 2 The zone shall be pumped with the submersible pump for an additional <br /> 12 hours before a sample is taken or until the Engineer, or his designee, <br /> is satisfied that the water sample meets appropriate sampling conditions <br /> The submersible pump provided shall be capable of pumping up to 75 <br /> GPM against 300 feet of total head <br /> August 2001 Division 111 -15 Ball Park& Park& Ride Wells Ph 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.