Laserfiche WebLink
Provide two electrical depth gauges capable of indicating changes in water level to the <br /> nearest 1110 foot Provide assistance to Engineer for supplemental measurements when <br /> ' required <br /> 2 02 PERSONNEL <br /> Provide qualified personnel during both the step drawdown and long-term pumping tests <br /> to operate the pumping test equipment <br /> PART 3 - EXECUTION <br /> 3 01 TESTING SCHEDULE <br /> ' After well development with the test pump is complete, commence the well pumping <br /> tests Schedule all tests sufficiently in advance per Division 11, Section 36, so that the <br /> Engineer can be onsite throughout each testing period <br /> 1 <br /> 3 02 STEP DRAWDOWN TEST <br /> A For this well test, operate the pump initially at a rate of approximately 1500 gpm <br /> The pumping rate will then be increased by 500-gpm increments at uniform two- <br /> hour intervals until the well has been tested at approximately 3000 gpm <br /> 1 B During the test, the Contractor will record the time, pumping level, discharge <br /> rate, and rate of sand production See Part 3 04 of this section for recording <br /> instructions <br /> fie 3 03 LONG-TERM PUMPING TEST <br /> A A long-term, continuous, constant rate, time-drawdown test shall commence not <br /> ' less than 24 hours and not more than 48 hours after the completion of the step <br /> drawdown test The rate of pumping shall be between 2000 and 3000 gpm and <br /> shall be determined by the Engineer The Contractor shall ensure that the <br /> pumping rate selected remains constant throughout the test The test duration <br /> shall be 24 hours or of a duration that will result in a straight line plot of at least <br /> four consecutive measurements of water level drawdown when plotted against <br /> ' the logarithm of elapsed time However, the test shall not be less than 12 hours <br /> in length When the test is completed and pump stopped, the Contractor shall <br /> measure recovery of the water level in the well for a period of approximately 8 <br /> ' hours See Part 3 04 of this section for recording instructions <br /> B During the long-term test if the rate of water pumped falls below or above the <br /> designated flow by 5% or more for a period of greater than 15 minutes, <br /> discontinue the test until the water level in the well recovers and stabilizes <br /> Repeat the test No payment will be made for the mcompleted test <br /> C One hour prior to the completion of the 24 hour, constant rate, pumping test, the <br /> Contractor shall retain the services of a State-certified laboratory to collect, <br /> preserve, transport, and conduct water quality testing on a water sample <br /> ' Conduct water quality testing in accordance with Chapter 15 of the California <br /> Code of Regulations, Title 22 "Domestic Water Quality and Monitoring" (Revised <br /> September, 1994) <br /> August 2001 Division Ill -32 Ball Park& Park& Ride Wells Ph 1 <br />