My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002230
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0542420
>
ARCHIVED REPORTS_XR0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 10:11:18 AM
Creation date
1/23/2020 9:28:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002230
RECORD_ID
PR0542420
PE
2960
FACILITY_ID
FA0024376
FACILITY_NAME
FORMER CHEVRON 98632
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b Each 2 minutes, from t = 14 to t = 20 <br /> c Each 5 minutes, from t = 25 to t = 50 <br /> d Each 10 minutes, from t = 60 to t = 120 <br /> e Each 15 minutes, from t = 135 to t = 1440 <br /> B In case of failure of the pump operation for a period greater than one percent of <br /> the elapsed pumping time from t 0, the test shall be suspended until the static <br /> I water level again has been attained Should the test be aborted as a result of a <br /> deficiency, malfunction, or other reason on the part of the Contractor's <br /> equipment or personnel, all time consumed in waiting for complete water level <br /> recovery and in resuming the pump test to the point where it was aborted or <br /> suspended shall be at no cost to the City <br /> SECTION 18 — FLOWMETER SURVEY & DEPTH SPECIFIC SAMPLING (Bid Item <br /> No s A21, B21, A22 & B22) <br /> PART 1 - GENERAL <br /> 101 DESCRIPTION <br /> ' This section includes a flowmeter (spinner) survey and depth specific sampling <br /> activities <br /> 102 MEASUREMENT AND PAYMENT <br /> A Payment for the Flowmeter Survey shall be paid for on a lump sum basis The <br /> contract lump sum price paid for the Flowmeter Survey (Bid Item No s A21 & <br /> B21) shall include full compensation for conforming to these requirements, <br /> furnishing all the labor, materials, tools, equipment, incidentals and for doing all <br /> the work involved in Flowmeter Survey necessary for completion of the work, as <br /> shown on the contract plans, as specified in the Standard Specifications and <br /> ' these special provisions and as directed by the Engineer and no additional <br /> compensation will be allowed <br /> Measurement will be based on the percentage of work completed as determined <br /> by the Engineer <br /> B Depth Specific Sampling shall be measured on a unit count basis Measurement <br /> will be based on the actual number of samplings as determined by actual count <br /> The contract unit price paid for Depth Specific Sampling (Bid Item No s A22 & <br /> B22) shall include full compensation for conforming to these requirements, <br /> furnishing all the labor, materials, tools, equipment, incidentals and for doing all <br /> the work involved in Depth Specific Sampling including performing the activities <br /> associated with depth specific sampling and laboratory testing as specified in the <br /> Standard Specifications, these special provisions and as directed by the <br /> Engineer and no additional compensation will be allowed <br /> PART 2 - EXECUTION <br /> T 2 01 FLOWMETER SURVEY <br /> 1 <br /> August 2001 Division 111 -34 Ball Park& Park & Ride Wells Ph 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.