Laserfiche WebLink
1 <br /> restored to the condition prior to the start of work The drill cuttings shall be <br /> removed from the sites and disposed of at the City's Wastewater Treatment <br /> Plant in an area designated by the Engineer <br /> 103 MEASUREMENT AND PAYMENT <br /> Clean-up During Construction & Final shall be paid for on a lump sum basis The <br /> contract lump sum price paid for Clean-up During Construction & Final (Bid Item No s <br /> A26 & B26) shall include full compensation for conforming to these requirements, <br /> furnishing all the labor, materials, tools, equipment, incidentals and for doing all the work <br /> involved in Clean-up During Construction & Final necessary for completion of the work, <br /> as shown on the contract plans, as specified in the Standard Specifications and these <br /> special provisions and as directed by the Engineer and no additional compensation will <br /> rbe allowed <br /> Measurement will be based on the percentage of work completed as determined by the <br /> Engineer <br /> END OF SECTION <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> August 20DI Division ill -38 Ball Park& Park & Ride Wells Ph 1 <br /> 1 <br />