My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002230
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0542420
>
ARCHIVED REPORTS_XR0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 10:11:18 AM
Creation date
1/23/2020 9:28:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002230
RECORD_ID
PR0542420
PE
2960
FACILITY_ID
FA0024376
FACILITY_NAME
FORMER CHEVRON 98632
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> restored to the condition prior to the start of work The drill cuttings shall be <br /> removed from the sites and disposed of at the City's Wastewater Treatment <br /> Plant in an area designated by the Engineer <br /> 103 MEASUREMENT AND PAYMENT <br /> Clean-up During Construction & Final shall be paid for on a lump sum basis The <br /> contract lump sum price paid for Clean-up During Construction & Final (Bid Item No s <br /> A26 & B26) shall include full compensation for conforming to these requirements, <br /> furnishing all the labor, materials, tools, equipment, incidentals and for doing all the work <br /> involved in Clean-up During Construction & Final necessary for completion of the work, <br /> as shown on the contract plans, as specified in the Standard Specifications and these <br /> special provisions and as directed by the Engineer and no additional compensation will <br /> rbe allowed <br /> Measurement will be based on the percentage of work completed as determined by the <br /> Engineer <br /> END OF SECTION <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> August 20DI Division ill -38 Ball Park& Park & Ride Wells Ph 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.