Laserfiche WebLink
feet below the static water level After chlorine insertion, the well shall be agitated for 2 <br /> hours utilizing a swab or bailer <br /> 3 03 WELL CAPPING <br /> Weld a 114-inch steel plate to the top of the wells' casing immediately after disinfection <br /> SECTION 20— CLEAN UP DURING CONSTRUCTION & FINAL CLEAN UP (Bid Item <br /> No s A26 & B26) <br /> 1 00 GENERAL <br /> A This section includes cleaning up during construction and final clean up on <br /> completion of the work <br /> B At all times maintain areas covered by the Contract and adjacent properties and <br /> public access roads free from accumulations of waste, debris, and rubbish <br /> caused by construction operations <br /> C Conduct cleaning and disposal operations to comply with local ordinances and <br /> antipollution laws Do not burn or bury rubbish or waste materials on project site <br /> Do not dispose of volatile wastes, such as mineral spirits, oil, or paint thinner, in <br /> storm or sanitary drains Do not dispose of wastes into streams or waterways <br /> D Use only cleaning materials recommended by manufacturer of surface to be <br /> cleaned <br /> 1 01 CLEANING DURING CONSTRUCTION <br /> A During execution of work, clean sites, adjacent properties, and public access <br /> roads and dispose of waste materials, debris, and rubbish to assure that <br /> buildings, grounds, and public properties are maintained free from accumulations <br /> of waste materials and rubbish <br /> B Wet down dry materials and rubbish to lay dust and prevent blowing dust <br /> C Provide containers for collection and disposal of waste materials, debris, and <br /> rubbish <br /> D Cover or wet excavated material leaving and arriving at the sites to prevent <br /> blowing dust Clean the public access roads to the sites of any material falling <br /> from the haul trucks <br /> 1 02 FINAL CLEANING <br /> rA At the completion of work and immediately prior to final inspection, clean the <br /> project sites as follows <br /> ' B Broom clean paved surfaces, rake clean landscaped areas <br /> C Remove from the sites all temporary structures and all materials, equipment, and <br /> appurtenances not required as a part of, or appurtenant to, the completed work <br /> D The Contractor shall be responsible for cleaning up the sites, including removal <br /> of all temporary piping, and general cleanup of sites so that the sites have been <br /> l <br /> August 2001 Division 111 -37 Ball Park& Park& Ride Wells Ph 1 <br />