My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002230
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0542420
>
ARCHIVED REPORTS_XR0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 10:11:18 AM
Creation date
1/23/2020 9:28:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002230
RECORD_ID
PR0542420
PE
2960
FACILITY_ID
FA0024376
FACILITY_NAME
FORMER CHEVRON 98632
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
person, firm or corporation, that he has carefully examined the location of the proposed <br /> work, that he has examined the plans and specifications, read the accompaingt <br /> instruction to bidders, and investigated the location of underground utilities, pro! <br /> limits, and hereby proposed to furnish all materials and do all the work required to <br /> complete the said work in accyrdancprw�msasdplans,et Earth n the following and tions and <br /> attached <br /> special provisions, for the unit price p <br /> schedules <br /> The undersigned further agrees that in case of default or breach in executing the <br /> required contract within ten (10) calendar or bond accompanying his bid shallce become the <br /> of Award <br /> of Contract, the proceeds of the check <br /> property of the City of Tracy <br /> In accordance with the provisions of Section 4215 of the California Government Code, <br /> the Contractor shall not be assessed liquidated damages for delay in completion of the <br /> project, when such delay was caused bythe or relocation failure <br /> ilur f the public <br /> u litilit agency <br /> Y r the owner of <br /> the utility facilities to provide for re <br /> in accordance with Section 4552 of the Government Code, the Contractor and <br /> ' subcontractors shall assign to the City all rights, title, and interest in and to all cause of <br /> action it may have under Section 4 of the Clayton Act (15 U S C Sec 15) or under the <br /> Cartwright Act (Chapter 2 [commencing with Section 167001 of Part 2 of Division 7 of the <br /> ' Business and Professions Code), arising from purchases of goods, services, or <br /> materials pursuant to the lic works effect effective at thecontract <br /> timethe <br /> thesubcontract <br /> bodyThis <br /> tenders s f nal <br /> snment <br /> shall be made and become <br /> payment of to the Contractor, without further acknowledgment by the parties <br /> Provided that the Contractor complies with all requirements of Section 22300 of the <br /> Public Contract Code at the request and expense of the Contractor, the Contractor may <br /> substitute securities for any money held by the City to ensure performance of the <br /> contract Deposit of securitia�ds{el subject <br /> ch complies with agreement <br /> requirements en the <br /> of the <br /> Contractor, the escrow agent, City, <br /> Public Contract Code Section 22300 <br /> In accordance with the provisions of Section 3400 of the California Public Contract <br /> Code, a Contractor shall not be permitted to substitute a material for those specified in <br /> the Contract Documents unless the Contractor submits a written request for substitution <br /> ' to the City no later than ten (10) working days prior to award of the Contract The <br /> Contractor shall, at its expense, have the material tested as required by the Engineer to <br /> determine the quality, strength, physical, chemical, or other characteristics, including <br /> ' durability, finish, efficiency, dimensions, service, and suitability are such that the item will <br /> fulfill its intended function The City shall make a determination for the Contractor, <br /> within ten (10) working days after the Contractor submits all substantiation of the offer, <br /> as to whether or not the offered substitution may be used in the performance of the <br /> Contract A failure of the City to issue a written determination to the Contractor prior to <br /> the award of the contract shall be deemed to be a rejection of the offered substitute <br /> The City Determination shall <br /> . sh II ridun� � eo edt�n allation and i use <br /> of a substituted item unlessti ppwriting by the Engineer if a s bstt to <br /> August 2001 Division IV-2 Ball Park& Park & Ride Wells Ph 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.