My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012850
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PELTIER
>
7099
>
2600 - Land Use Program
>
PA-1900304
>
SU0012850
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 2:28:36 PM
Creation date
1/23/2020 10:16:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012850
PE
2625
FACILITY_NAME
PA-1900304
STREET_NUMBER
7099
Direction
E
STREET_NAME
PELTIER
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
00526061
ENTERED_DATE
1/13/2020 12:00:00 AM
SITE_LOCATION
7099 E PELTIER RD
RECEIVED_DATE
1/8/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. ACCESSORY STRUCTURE COVERAGE -The square footage of structures used for accessory <br /> uses related to a winery (i.e. the Total Coverage minus the Production Facility coverage): <br /> a. Square feet: cA t: U S�- <br /> b. Percentage of production facility coverage: ° b <br /> H. TRAFFIC–Please provide estimates for the proposed Winery or Oft=Site Wine Cellar operations <br /> including Wine Tasting room activities(excluding Marketing invents, Accessory Winery Events, <br /> Wine Release Events or Industry Events): <br /> PROPOSED <br /> a. Days of operation 4 <br /> b. Flours of operation C. <br /> c. Anticipated number of shifts t <br /> d. Expected number of full-time employees 1 b <br /> e. Expected number of part-time employees y <br /> f. Anticipated number of visitors <br /> 1. on busiest day IOU <br /> 2. on average/week 10 o <br /> I. Anticipated number of trucks <br /> (deliveries/pick-ups) <br /> 1. on busiest day <br /> 2. on average/week L 6SS 6 h 0 r <br /> J. PARKING–please indicate the number of parking spaces associated with the Winery or Off-Site <br /> Wine Cellar: <br /> PROPOSED <br /> a. Permanent Customer parking spaces + <br /> b. Permanent Employee parking spaces <br /> c. Permanent handicap parking spaces <br /> d. Loading areas �- <br /> e. Overflow parking spaces 1 SO <br /> f. Overflow handicap parking spaces — S <br /> 11. SUPPLEMENTAL INFORMATION PERTAINING TO EVENTS PROPOSED AT WINERY <br /> OR OFF-SITZ; WINE CELLAR(This portion should only be tilled out if Marketing Events, <br /> Accessory Winery Events and/or Wine Release Events are proposed as part of the land use <br /> application). <br /> A. MARKETING EVENTS: Please provide the following information about proposed Marketing <br /> Events: <br /> a. Maximum number of Marketing Events per calendar year: _ <br /> b. Maximum number of attendees at each Marketing Event: BUD <br /> c. Anticipated hours of Marketing Events: 5_l we 5 <br /> d. Food Served (catered,prepackaged, prepared on-site,ctc.): _r- �yttic�S <br /> "Note: (Please identify indoor and outdoor areas used for eating and/or assembly on the Site <br /> Approval or Use permit site plan) <br /> Page 5 of 6 <br /> F:\APPLICATIONFORMSANDHANDOUTS\Planning Application Forms\ <br /> Winery or Wine Cellar Supplemental Info&Marketing Plan REVISED 1.31.19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.