Laserfiche WebLink
Potentially Less Than Less Than Analyzed <br /> Significant Significant with Significant No In The <br /> 9 `Mitigation 9 <br /> Impact Incorporated Impact Impact Prior EIR <br /> IX. HAZARDS AND HAZARDOUS MATERIALS <br /> VVould the project <br /> a) Create a significant hazard to the public or the environment <br /> through the routine transport,use,or disposal of hazardous —� <br /> materials? ❑ ❑ <br /> b) Create a significant hazard to the public or the environment <br /> through reasonably foreseeable uoset and accident <br /> conditions involving the release of hazardous materials into [ ❑ Z ❑ ❑ <br /> the environment? <br /> c) Emit hazardous emissions or handle hazardous or acutely <br /> hazardous materals, substances. or waste within one- ❑ ❑ , F-1 ❑ <br /> quarter mile of an existing or proposed school? <br /> d) Be located on a site which is included on a list of hazardous <br /> materials sites compiled pursuant to Government Code <br /> Section 65562.5 and, as a result, would it create a ❑ ❑ Z ❑ ❑ <br /> significant hazard to the public or the environment? <br /> e) For a project located within an airport land use plan or, <br /> where such a plan has not been adopted,within two miles <br /> of a pablic airport or public use airport. would the project ❑ ❑ Q ❑ ❑ <br /> result in a sa�ety hazard or excessive nose for people <br /> residing or vrorkirg in the protect area? <br /> f) Impair implementation of or physically interfere with an <br /> adopted emergency response plan or emergency ❑ ❑, ❑ ❑ <br /> evacuation plan? <br /> g) Expose people or structures,either directly or indirectly,to <br /> a significant risk of loss, injury or death involving wildland <br /> fires,including where vAldlands are adjacent to urbanized ❑ ❑ i,Z ❑ ❑ <br /> areas or where residences are intermixed with wildlands7 <br /> Impact Discussion: <br /> a-g) The project is a Use Permit application for a slaughterhouse and chicken farm on a three(3)acre portion of one(1) <br /> legal parcel totaling 40.39-acres .n the AG-40(General Agriculture,40-acre minimum).The project proposes the <br /> construction of a 4,000 square foot agricultural building, with 2,430 square feet utilized as Ag storage and 1,600 <br /> square feet utilized as a slaughter house The project also proposes the corstruction of two(2)800 square foot <br /> metal Ag barns within a 6.00 square foot chicken enclosure to be utilized as chicken shelters for a maximum of <br /> 3.000 chickens. <br /> The project site is not located on a site which is included on a list of hazardous materials sites compiled pursuant <br /> to Government Code Section 65962.5 and. as a result would no;create a s gnificant hazard to the public or the <br /> envircnment. <br /> The applicant proposes to slaughter a maximum of one(1)animal per day.The renderings from the slaughter will <br /> be collected,and taken to Sisk Recyclirg in Company Turlock,California immediately after slaughter Additionally, <br /> the slaughterhouse will be subject to the regulations of the California Department of Food and Agriculture. <br /> The project woud not result in,create cr induce hazards and associated risks to the public.Construction acdwtres <br /> for the project typically involve the use of toxic or hazardous materials such as paint. fuels, and solvents. <br /> Construction activities would be subject to federal,stare, and local laws and requirements designed to minimize <br /> and avoid potential health and safety risks associated with hazardous materials No significant impacts are <br /> is <br /> Planning Commission Staff Report, Item # 1 02/06/2020 — PA-1800316 (UP) 18 <br /> Environmental Review <br />