Laserfiche WebLink
TABLE C1, continued <br /> WELL DATE TIME DEPTH GROUNDWATER <br /> TO ELEVATION <br />+ WATER feet, amsl <br /> feet <br /> MW-4 23.90 Ft. total depth,diameter 2-in. Rim Elevation: 27.53 <br /> Installed 04119M (Monitoring performed by KWmfeider from tap of casing_ <br /> �~ 4/20/88 Not Recorded 5.57 21.W <br /> L Monitoring Perkonrred by Daman&Moore from top Of casing. <br /> 11/20190 Not Recorded 6.01 21.52 <br /> Monitor;ng perfomeed by Pw*er EmArorxrrentw Services from top of casing. <br /> L Resurvey by Benchmark Consultants, Oct. 1995-Casing Elevation: 27.06 <br /> 9121/92 Not Recorded 6.41 20.65 <br /> 2117/93 Noor Recorded 4.63 22.43 <br /> 3/2/93 mA Recorded 4.57 <br /> 22.49 <br /> co <br /> 5/19/93 10:08 7.37 19.69 <br /> 8/9/93 12:39 5.83 21.23 <br /> 11/30/93 12:01 5.12 21.94 <br /> 9/8/94 13:08 5.78 21.28 <br /> 12/22/94 13:16 5.15 21.91 ' <br /> 3/15195 13:04 4.52 22.54 <br /> 9/26/95 11:24 6.06 21.00 <br /> l <br /> 2123199 10:38 4.81 22.25 � <br />' 6/27/99 8:21 5.65 21.41 <br /> 8131/99 9:30 5.96 21.10 F <br /> 2/3/00 10:05 5.28 21.78 <br /> E <br /> r, onaoring perfomred by H20GECC Casing Elevation: 27.06 <br /> 80 <br /> 11/19/00 8:58 6.26 20. <br /> 2/23/01 09:08 4.93 22.11 <br /> 3 k <br />! 21.62 <br /> 5119/01 10:53 5.44 <br /> MW-5 14.90 Ft. total depth, diameter 2-in. Rim Elevation:\ 27.46 <br /> irmtwied Owl/95 MwAonrg Perfo �by Parker ErnironnwdM Services from top of casing. <br /> 9126195 11:24 6.37 21.09 <br /> 2/23/99 10:41 5.16 22.30 <br /> 6/27/99 8:18 5.95 21.51 <br /> 8/31/99 9:23 6.28 21.18 <br /> 213100 9:40 5.08 22.38 <br /> Monitoring performed by H2OGEOL Casing Elevation: 27.46 20.88 <br /> f 11/19/00 8:48 6.58 22.20 <br /> 2/23101 08:51 5.26 21.72 <br /> L 5/19101 10:47 5.74 <br /> Table C1, Page 4of5 H20GE01, A GRouru).TER CONSUCANCY <br />