Laserfiche WebLink
I <br /> TABLE C1, continued <br /> WELL DATE TIME DEPTH GROUNDWATER � <br /> TO ELEVATION <br /> WATER feet, ams] <br /> feet <br /> MW-6 14.70 Ft. total depth, diameter 2-in. Rim Elevation: 27.25 <br /> Installed 09/01/95 Mondaing PuftrTed by Parker Enwaynental Services€ram taP Of casing_ <br /> I 9126195 11:09 6.19 21.06 <br /> 2/23199 10:50 5.00 22.25 <br /> 6127199 8:19 5.79 21.46 <br /> 8131199 9:16 6.12 21.13 <br /> 213100 10:00 5.13 22.12 <br /> Mortaring performed by l-1'1OGEOL Casing Elevation: 27.25 <br /> 11/19/00 8:53 6.42 20.83 <br /> 2/23101 09:10 5.09 22.16 <br /> 5119101 10:52 5.60 21.65 <br /> E <br /> MW-7 14.70 Ft_ total depth,diameer 24n. Rim Elevation: 27.27 <br /> Installed 09/01/95 AAm-bring perftffned by Parker Eff*onrnwW SWACSrs from taP of casing- <br /> 9126195 11:01 6.33 20.94 <br /> 2123199 10:49 5.03 22.24 ' <br /> 6/27199 8:20 5.92 21.35 <br /> 8131199 9:18 6.26 21.01 <br /> 213100 9:55 5.21 22.06 t <br /> Moroni M Ft20GEOL Casing Elevation: 27.27 <br /> ns performed <br /> 11/19/00 8:52 6.52 20.75 <br /> 2123101 09:04 5.17 22.10 <br /> 5119101 10:51 5.73 21.54 <br /> MW-8 19.10 Ft. total depth, diameter Erin. Rim Elevation: 27.31 <br /> Installed=01/96 Monitoring pwformed try Parker Envimnmental Services from top of using•21.09 <br /> 9126195 11:12 6.22 <br /> 2/23M 10:42 5.01 22.30 <br /> 6127199 8:17 5.80 21.51 <br /> 8131199 9:26 6.14 21.17 <br /> 213100 9:35 5.09 72.22 <br /> Monitoring perfom,ad by H2WEOL Casing Elevation: 27.31 <br /> 11/19/00 8:55 6.45 20.86 <br /> 2123101 08:46 5.13 22.18 <br /> 5119101 10:48 5.60 21.71 <br /> Table C1, Page 5 of 5 H2 0 GEO L A GROUNDWATER CONSULTANCY <br />