Laserfiche WebLink
I <br /> TABLE OF CONTENTS <br /> I <br /> I- 1Z I NTRODUC:TI ON 1 <br /> 2. 0 FACILITY DESCRIPTION 1 <br /> I <br /> i. 0 PROJELI HISTORY 1 <br /> 5. 0 FINDINGS 1 <br /> 5. 1 l,eol ogy 1 <br /> 5. 2 Hydrogeology 1 <br /> 5. 3 Analytical Results 1 <br /> 6. 0 D 1 SCUSS I ON 2 <br /> I 6. 1 Extent of Soil Lonta■enation 2 <br /> 6. 2 Extent of Groundwater Contamination 3 <br /> 7. 0 PROPOSED REMEDIATION WORK PLAN -i <br /> 7. 1 Soil Contamination s <br />�y /. 2 Water Lontaminat:on s <br /> 6. 0 CONFIRMATION SAMPLING 4 <br /> APPENDICES 5 <br /> APPENDIX 1 : Site Location 5 <br /> I <br /> APPENDIX 11 : Plot N1an 7 <br /> APPENDIX III : Suspected Areas of Contamination 9 <br /> I APPENDIX IV: Proposed Borang Locations for Bioremediation 11 <br /> APPENDIX V; Location of Soil borings and Monitoring Wells 13 <br /> APPENDIX VI : Location of Proposed Monitoring Wells 15 <br /> I <br /> P <br />