Laserfiche WebLink
r. TFCC sugg <br /> Pat that two possible options be considered for <br /> approaching the next phase of work conducted at the site. The <br /> first option involves additional subsurface investiti gation at the <br /> of <br /> site in order to further d <br /> contamination The second opt n involvestthe <br /> soil and groundwater etroleum hydrocarbon <br /> excavation and treatment and/or disposal..posyng of contaminated <br /> contaminated soils and pumping <br /> groundwater from the excavations.. Rased on economic and time <br /> groundwater <br /> ears that the second option,. the immediate removal of <br /> fadcontaininated soil and groundwater, is the most viable alternative; <br /> s <br /> S w <br /> i PAGE 2 <br /> 3 275 GRANT LINE ROAD <br /> i <br /> ONE A 9MMIJU I= <br /> i <br />