Laserfiche WebLink
ear to be present in this area at the <br /> 9 feet below surface <br /> r� Soil contamination does appSB-2, SB-4, and <br /> soil/groundwater interface (approximately roducts at this depth. <br /> grade) . Samples collected from soil bbon Ps SB-1, <br /> Mw_1 all contained petroleum by depth of g feet <br /> SB-2, and SB-4. Concertrations ranged <br /> TpHq was detected at elevated concentrations at a r. GP cess of 1000 <br /> in soil borings MW-1, agencies. <br /> 100 <br /> from 3.6 ppm to 5100 ppm• Concentrations of y rB ulatory <br /> ically required to be remediated to g is shown in <br /> Ppm are typically extent of TPHg contamination <br /> Section. The estimated6lat�PHg <br /> The estimated vertical Figure r <br /> Figure 5, TPHg Concentration Cross1s given in <br /> extent of TPHg contamination <br /> Concentration plan Map. depth of 9 feet <br /> Concentrations ranged from <br /> TPHd was detected at elevated <br /> andoSBe2. cone tr a ns <br /> in soil borings MW-1, SB-i, <br /> re ulatory agencies. a <br /> 6.0 m to 360 ppm• Soiis with concentrations of TPH in excess o <br /> 100 ppm may be required to be remediated by The estimated <br /> contamination is illustrated <br /> The estimated vertical extent of 'FPCr is shown in Figure 8, TPHd <br /> in Figure 7, TPHd CHdccontamination ss Section. <br /> lateral extent of TP <br /> Concentration Plan Map. <br /> ere ed <br /> s MW-1, SB-1, and <br /> BTEX constituents Benzene f 9 feetuinesoil bcaingcte o 2000d at 1ppbtin <br /> concentrations at a depth o ed from 150 ppb t b to 1400 <br /> Toluene concentrations ranged from 170 l <br /> SB-2, Benzene concentrations ran established .for <br /> these borings. No clean-up level has been Figure 9, Benzene <br /> Ppb in these borings. In <br /> the PSection, the estimated vertical <br /> resence of Benzene <br /> Cross s• <br /> and Toluene G Figure 10, <br /> extent of <br /> these constituents is illustrated. <br /> ishshown iintdlai:eral <br /> extent of Benzene and Toluene contamination <br /> Benzene and Toluene Concentration Pian Map' lenes were detected at <br /> depth of 9 feet in soil borings MW-11 <br /> BTEX constituents Ethylbenzene and Tota y <br /> elevated concentrations at a lines <br /> and SB-4• lbenzene concentrations in these borings <br /> ranged <br /> from <br /> b to 20,000 ppb. Concentrations b Total clean-uo <br /> ranged from 15 js ed from 35 ppb to 33,000. Pp <br /> in these borings rang For. the presence (I Ett of. these ze two <br /> or <br /> level has been established •• Eth lbenzene and Total Xylenes <br /> Total Xylenes in soils. The 11te vertical bonze exaeextent ofthese <br /> constituents is shown in Fig',':The estimated lateral e lbenzene and <br /> Concentration Cross Section' <br /> two constituents is illustrated in Figure 12, Y <br /> Total Xylenes Concentration Plan Map- <br /> -n of the <br /> Concentration of 34 ppm and 66 ppm <br /> oil and Grease was also detected in the northwestern p <br /> depth of-9 feetr,cop . soil borings SB-2_ and SB-4, - <br /> were rre orted t a iin samples from <br /> were rep The distribution.of ail and Grease in the subsurface <br /> respectively• oil and Grease Concentration Plan Map• <br /> is shown in Figure 13, <br /> PAGE 18 <br /> 275 GRANT LINE ROAD <br />