Laserfiche WebLink
Table 3 , continued <br /> Sample Date <br /> & Depth of TPH-D TPH-G B T E X TOG <br /> Sample ( ft ) (ppm) ( ppm) (ppm) (ppm) <br /> ----------------------------------------------------------- <br /> BT Center/3 ' N D N D N D N D N D N D N D <br /> BT Center/8 ' N D N . D N D N D N D N D N D. <br /> BT South/8 ' N D N D N D N . D N D N D 91 <br /> ----------------------------------------------------------- <br /> Method <br /> Detection 1 0 1 0 5 0 5 0 5 . 0 5 0 10 <br /> Limit <br /> ---------------------------------------------------------- <br /> Bldg Tr Building Trench <br /> TPH-D Total Petroleum Hydrocarbons as Diesel <br /> TPH-G . Total Petroleum Hydrocarbons as Gasoline <br /> BTEX .Benzene, toluene , ethylbenzene, total xylenes <br /> TOG Total Oil and Grease <br /> ppm . . Parts per million <br /> ppb Parts per billion ( 1 ppm = 1 , 000 ppb) <br /> No samples for certified analyses have been acquired from <br /> the soil to be remediated , although it appears that mean <br /> concentrations of TPH are less than 1 , 000 ppm <br /> With the approval of PHS/EHD , the sub3ect soil will be <br /> transported across Grant Line Road to 2360 East Street , <br /> placed atop bermed , 6-mil polyethylene sheeting, and <br /> treated using static pile aeration technology in accordance <br /> with the principles described in the enclosed bio- <br /> remediation overview The East Street site will remain <br /> fenced and the soil under remediation will be kept <br /> sufficiently moist to preclude dust blowing into the <br /> shopping center located ad3acent to the treatment area . If <br /> EPM is able to began treatment while the weather remains <br /> warm, we expect that the soil will be thoroughly remediated <br /> within 60 days <br /> As our goal is to reduce the levels of contamination to <br /> below laboratory detection limits , EPM requests permission <br /> to use the remediated soil as clean fill at 2360 East <br /> Street <br /> Work will begin within two weeks of EPM' s receipt of your <br /> authorization to proceed All work will be performed under <br /> 6. <br />