My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002351
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
298
>
3500 - Local Oversight Program
>
PR0545197
>
ARCHIVED REPORTS_XR0002351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 10:56:29 AM
Creation date
1/24/2020 10:46:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002351
RECORD_ID
PR0545197
PE
3528
FACILITY_ID
FA0020769
FACILITY_NAME
HAPPY CARS AUTO CARE
STREET_NUMBER
298
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23321019
CURRENT_STATUS
02
SITE_LOCATION
298 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> KLEINFELDER <br /> 5 PROPOSED SAMPLING PLAN <br /> This sampling plan has been formulated guidance document "Regional Board <br /> P gp using the c� <br /> t Staff Recommendations for Initial Evaluation and Investigation of Underground Tanks," <br /> June 2, 1988, prepared by staff of the North Coast, San Francisco Bay, and Central Valley <br /> Regional Water Quality Control Boards. One important concept in this document is that <br /> data from ground water investigations carried out at adjacent sites can be used to ,justify <br /> scaling down the size of a proposed monitoring network <br /> Since information on ground water depth and flow direction is available from the Food and <br /> ' Liquor site, only two ground water monitoring points are proposed for the Jordan site <br /> ' 5 1 SITE PREPARATION <br /> A backhoe will be brought on site to prepare the pits for soil and ground water sampling <br /> First, the floors of the pits will be excavated to a depth of b feet and a hole will be dug in <br /> the center of each pit to a depth of approximately 2 feet below the water table Then, soil <br /> ' at the north side of each pit will be removed to a depth just above the water table forming a <br /> pad where a well point can be installed <br /> ' 5.2 SOIL SAMPLING <br /> ' Three pairs of soil samples will be taken from each pit A pair will consist of a sample <br /> taken at 1 foot below the ground surface and another taken at a depth of 5 feet. These <br /> ' samples will be taken from the sides of the pit, above the water table using a backhoe A <br /> PID will be used to detect any hot spots that should be sampled Samples will be collected <br /> rusing a brass tube and will be submitted under chain-of-custody to a certified laboratory <br /> and analyzed for total petroleum hydrocarbons (by EXTN/GC-FID) and volatile aromatics <br /> ' (benzene, ethyl benzene, toluene, and xylene) by EPA Method 8020 The backhoe bucket <br /> and sampling equipment will be decontaminated between samplings be steam cleaning <br /> r113-88-915 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.