My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 11:25:32 AM
Creation date
1/24/2020 11:10:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09%12111? 16:46 '/GSI—SRCTO -. 120346401 s8 p12 <br /> Work Plan For Soil Boring aodMonitoring Well Installation- Unocal Station No. 6981 <br /> September 12. 1997 <br /> remaining wells at the site to evaluate the effectiveness of the ORC. A no-purge <br /> sample will be collected from well MW-2 during the first and second quarters 1998. <br /> PROJECT STAFF <br /> Mr. Stephen I Carter, a Registered Geologist in the State of California (R.G. No. 5577), <br /> will provide technical oversight and review of the activities associated with the proposed <br /> scope of work, Mr. Greg Gurss, Project Manager, will supervise implementation of field <br /> and office operations. GSI employs a staff of geologists, engineers, and technicians who <br /> will assist with the project. <br /> MPDS will be responsible for activities associated with quarterly monitoring and sampling <br /> of the monitoring well network. MPDS will analyze these data independently of GSI, and <br /> will submit reports as requested by Tosco. <br /> SCHEDULE <br /> Implementation of the proposed scope of work will commence upon receipt of regulatory <br /> approval. <br /> �ass.at•t 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.