My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012098
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
ARCHIVED REPORTS_XR0012098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 12:46:55 PM
Creation date
1/24/2020 11:42:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012098
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Third Quarter 1996 Status Report - Unocal Station No #6981 <br /> October 31, 1996 <br /> Between June 25 and September 25, 1996 the VES operated approximately 785 hours (33 <br /> days), or 36% of the time The VES continues to have problems flaming out, and repeated <br /> efforts to correct this issue in the field have not resolved the problem. Soil vapor was <br /> extracted from wells VW-2, VW-4, and VW-5 during the third quarter 1996, as field <br /> monitoring indicated these wells had the highest hydrocarbon concentrations. The <br /> operational data are summarized on the attached tables <br /> FOURTH QUARTER 1996 SCHEDULED ACTIVITIES <br /> Groundwater monitoring wells at the site will be monitored and sampled GSI will <br /> continue to monitor VES operational parameters every two weeks. Influent and effluent <br /> vapor stream samples will be collected monthly and analyzed as required in the permit <br /> The Fourth Quarter 1996 Status Report will be submitted to the appropriate regulatory <br /> agencies by January 31, 1997 <br /> Unocal will install a well to replace the wells abandoned at the request of the City of <br /> Stockton to facilitate reconstruction of the intersection of March Lane and Pacific Avenue <br /> The new well will be installed upon completion of the reconstruction activities, tentatively <br /> scheduled for 1997 <br /> If you have questions, please call us in Sacramento at (916) 631-1300 <br /> Sincerely, ,�ERED GEp'o <br /> GeoStrategies QAC? Q�EN J Cq,9�y'id,� <br /> CID F <br /> Stephen J. C r, R G No. 5577 <br /> Project Geologist <br /> 'c cAj90 <br /> F CAL <br /> Gre A Gurss <br /> Protect Manager <br /> Attachments. Table 1 - Summary of VES Chemical Analytical Data <br /> Table 2 - Summary of VES Operation <br /> Figure 1 Vicinity Map <br /> Figure 2 Site Plan <br /> Field Methods and Procedures <br /> Chemical Analytical Data and Chain-of-Custody Forms <br /> 485506-1 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.