Laserfiche WebLink
i <br /> . Unocal Station No #6981 <br /> November 9, 1995 <br /> (Pb), phosphorus (P), and chlorinated hydrocarbons (EPA Method 8010 compounds) <br /> None of these constituents were detected in the influent vapor stream samples <br /> It is our understanding that the City of Stockton intends to widen March Lane in mid to <br /> late 1996 This may affect several of the groundwater monitoring wells on the southern <br /> portion of the site If so, these wells need to be abandoned prior to initiation of <br /> construction activities <br /> FOURTH QUARTER 1995 ACTIVITIES <br /> The groundwater monitoring and sampling program will be modified as proposed in GSI <br /> Report 4855 02-4, Second Quarter 1995 Status Report, dated July 24, 1995 Each well <br /> will be monitored and the perimeter wells )MW-6, MW-9, MW-10, MW-11, MW-12, and <br /> MW-13) will be sampled This work will be performed by MPDS and the Quarterly Data <br /> Reports will be submitted to the appropriate regulatory agencies by MPDS on behalf of <br /> Unocal <br /> The catalyst is scheduled to be removed in October and sent to the manufacturer (Johnson <br /> and Matthey) for testing Upon receiving the results of the catalyst testing, we intend to <br /> • start the VES during the fourth quarter 1995 <br /> The Fourth Quarter 1995 Status Report will be submitted to the appropriate regulatory <br /> agencies by January 31, 1996. <br /> 4855 02-5 3 <br />