My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
17750
>
2900 - Site Mitigation Program
>
PR0501477
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:22 AM
Creation date
1/24/2020 2:15:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0501477
PE
2965
FACILITY_ID
FA0005116
FACILITY_NAME
SMS BRINERS INC
STREET_NUMBER
17750
Direction
E
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95206
APN
18314010
CURRENT_STATUS
01
SITE_LOCATION
17750 E HWY 4
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SMS Briners Field Work Page 3 of 3 <br /> Engineers(LSCE)on approving a work plan and issuing a permit for drilling at the SMS Briners site. I saw <br /> a portion of an email in which you recognized that Golder would be doing additional field work, but that <br /> LSCE's permit does not include Golder's work. I thought I'd touch base to fill you in on our plans. <br /> We will be advancing three CPT borings to collect data for geotechnical analysis. We will also drill 5 <br /> borings via convential methods to collect samples for environmental analysis (chloride concentrations). <br /> This data will be used for modeling the vadose zone under the ponds and assist in developing closure plan <br /> alternatives. When I called SJCEHD(before I was given your name as the site contact), I was told Golder <br /> will need to develop a work plan because of the environmental analysis. <br /> I have been developing such a plan, and have left a message for Howard Hold to inform him of our <br /> proposed work so we may expedite the planning and permitting process. Once I have touched base with <br /> him, I will submit the work plan to you for review. Would you please confirm that this is the correct <br /> approach? I will also work with the County's"counter" to get permits for the CPT borings. <br /> Please call me at the number below if you need. Thanks! <br /> Maureen Mathias, Project Engineer <br /> Golder Associates Inc. <br /> 1009 Enterprise Way <br /> Roseville, CA 95678 <br /> (916) 786 -2424 ph <br /> (916) 786 -2434 fax <br /> 10/13/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.