Laserfiche WebLink
Dividend Development Corporation <br /> Workplan to Determine Extent of Soil Contamination May 13, 5 � <br /> Paggee 5 <br /> SAMPLE ANALYSIS: <br /> The samples will be submitted to a State of California approved <br /> hazardous waste testing laboratory for chemical analysis. The <br /> sample integrity will be maintained by following strict chain - of <br /> custody procedures from the collection point through transport and <br /> delivery to the' laboratory. The chain of custody documentation <br /> will be part of the final report. EPA Method 8015M (DHS-TPH) , EPA i <br /> Method 8020 (BTXE) , and EPA Method 602 (Water) , will be utilized <br /> for measuring total petroleum hydrocarbons (TPH) and purgeable <br /> volatile 'aromatics. <br /> Toxic Technology, Inc. respectfully submits this workplan for <br /> review and comment. If- there are any questions, please call me at <br /> 714/668-1669. If the workplan is accepted, TTI can mobilize within <br /> 72 hours to begin the investigation. <br /> Sincerely, <br /> Toxic Technology, Inc. . <br /> Jeffrey A. Smeak <br /> Field OperatLans Manager <br /> , Tox' echnology <br /> 11 V <br /> F. * ScMtUHe4j JFV . , h.D. <br /> Sr. older,&-666 <br /> JAS/ <br /> Enclos CALL <br /> a <br /> I` <br /> Toxic Technology, Inc. ' <br />