My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
13170
>
2900 - Site Mitigation Program
>
PR0505432
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 3:08:30 PM
Creation date
1/24/2020 2:34:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0505432
PE
2960
FACILITY_ID
FA0006779
FACILITY_NAME
DIVIDEND PROPERTY
STREET_NUMBER
13170
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
13170 W GRANT LINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dividend Development Corporation October 23, 1991 <br /> Addendum Remediation Workplan Page 2 <br /> The four (4) speci'fic' subjects' mentioned in the memorandum which <br /> need to be addressed are- listed -below.: <br /> * Propose a means for removing: "free product" from the capillary <br /> fringe (soil groundwater interface) and the. groundwater. <br /> * Designate a method to substantiate if all of 'the contaminated <br /> . soil has been excavated -in- the field. <br /> * Designate a disposal method for water entrained in the <br /> r excaveted._-petroleum-nimpacted soil -_ _ <br /> * Designate a -soil biotreatment location, and a method for <br /> substantiating the success of. biotreatment. _ <br /> WORKPLAN ADDENDUM CONTEXT: <br /> In the interest of project expediency, instead • of submitting a_.- <br /> revised remediation workplan, TTI. has prepared an Addendum <br /> Remediation Workplan- which should be joined - with the original <br /> workplan submitted to the RWQCB. <br /> i <br /> ISSUE: <br /> REMOVING "FREE PRODUCT" FROM CAPILLARY- FRINGEAND GROUNDWATER: . <br /> There is a possibility that some free product may be exposed in the <br /> capillary fringe of the. aquifer during excavation of the lowermost <br /> contaminated soils. Soil. from .the capillary fringe of: the aquifer <br /> will be inspected for free product -during excavation operations. <br /> A field, map shall : be constructed in the field by the project <br /> geologist whereby a description <br /> If free product is. encountered within . the capillary fringe, the <br /> Toxic Technology, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.