Laserfiche WebLink
Mr. Michael J. Infurna, Jr. , <br /> September 14, 1998 <br /> Page 2 <br /> • The groundwater samples will be analyzed for BTEX using EPA Method 8020, PAI-Is using <br /> EPA Method 8270 SIM; for TPH using EPA Method 8015M quantified against a gasoline <br /> standard (C4 to C12 carbon range), and for TPH using EPA Method 8015M quantified against <br /> a diesel standard (C 10 to C24 carbon range). <br /> The field work will be scheduled within one week of your approval of this proposed work plan. <br /> You will be notified at least 48 hours in advance of the start of any field work. Please call <br /> Elizabeth Lu(925/842-6855) if you have any questions or require additional information. <br /> Sincerely, <br /> K. L. Hower <br /> Project Manager <br /> California Site Remediation <br /> TETL0464.DOC <br /> Attachments: Figure 1 — Site Plan <br /> Master File Record Information Form(Green Form) <br /> Check for$234.00 <br /> cc: Elizabeth Lu—CPL/Geomatrix Consultants, Inc. <br /> Michael Keim—Geomatrix Consultants, Inc. <br /> Patrick Riddle (w/o Army .►t v-w-s <br /> Darlene Mansfield C w/o ArrrAt,4tM"rS) <br />