My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
474
>
3500 - Local Oversight Program
>
PR0545203
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 4:39:27 PM
Creation date
1/24/2020 4:28:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545203
PE
3528
FACILITY_ID
FA0006261
FACILITY_NAME
WHEEL COUNTRY
STREET_NUMBER
474
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
474 GRANT LINE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA= SITE SAFETY PLAN <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on all SMTH worksites. Level D includes: <br /> I/ Steel toed boots <br /> I/ Safety Glasses <br /> I/ Hard Hat <br /> For each task on this project, identify additional protective garments as required, include the conditions <br /> under which the level of PPE would be modified for each task. <br /> .......... <br /> ........... <br /> ................. <br /> ............................ <br /> ........ <br /> c ........ ....... <br /> ....... con. <br /> .. .... .. ...Garmen. <br /> diti ..P S <br /> .....-- o - on:..... .. <br /> ........... <br /> ............ <br /> ... ... .... <br /> 1,2 Working Near Vehicle Orange Vests <br /> 1,2 >20 ppm for 5 minutes 1t2 Face Respirator <br /> 1,2 >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all SMTH hazardous waste sites. <br /> Site will be secured as follows: Mark off work zone with barricades and caution to e. <br /> Work Zones will be marked as follows: Barricades and caution tape will be used to mark off <br /> work zone. <br /> MARK WORK ZONES ON SITE MAP 11 CHECK WHEN DONE <br /> PAGE 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.