Laserfiche WebLink
s]�= SITE SAFETY PLAN <br /> On-site communications: ❑ Radio ® Verbal ❑ Hand Signals <br /> ❑ Other <br /> Designate hand signals here: <br /> rOff-site communications: ❑ Radio ® Telephone <br /> L ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beginning work activities. <br /> MARK EVACUATION ROUTEISI ON SITE MAP 0 CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective eauipment (i.e., <br /> gloves, coveralls) will be placed on and covered with 6- <br /> mil plastic sheeting along witKthe drill cuttings. <br /> Location of Wash Water. Site Office <br /> Location of Toilet. Site Office <br /> Location of Drinking Water. SMTH truck/Site Office <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP ❑ CHECK WHENDONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> . I <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored on- j <br /> site until appropriate disposal methods are <br /> determined. E <br /> t <br /> r � <br /> iw I <br /> PAGE 8 <br /> ;, lr <br /> I <br />