Laserfiche WebLink
CHRONOLOGY <br /> 724 GRANTLINE RD <br /> TRACY <br /> j <br /> j <br /> 01/05/87 3 soil borings were drilled and I monitoring well (MW-1) down gradient i <br /> of the two 10,000 gallon underground tanks (UST) was installed at the <br /> site, and soil and water samples were collected. MW-1 is within 10 feet of E <br /> the tanks. Neither USTs had been removed at this point. <br /> 02/05/87 PHS/EHD received results of the soil and water samplings. Results <br /> indicated toluene contamination in the soil ranging from 13 to 43 ppb, <br /> and no detectable levels of benzene,toluene, xylenes in groundwater. <br /> i <br /> 08/19/87 The two 10,000 gallon USTs were removed: Grab water samples and soil <br /> samples beneath tank base were collected. <br /> 09/25/87 PHS/EHD received results of sampling analyses. Results of grab water <br /> k sample indicate the presence of total volatile hydrocarbons (TVH) at 1,740 <br /> ppb,total extractable hydrocarbons (TEH) at 1,740 ppb, benzene at 2.6 <br /> ppb, toluene at 1.6 ppb, ethylbenzene at 13.8 ppb, and xylenes at 8.8 ppb. <br /> 10/13/87 Water sampling from MW-1 down gradient of former tank location was <br /> collected by a different consultant. <br /> 11/16/87 PHS/EHD received results of analyses from the monitoring well water <br /> sampling. The results were below the detection limit for TPH-g (detection <br /> limit at ppb) and BTEX (at 0.5 ppb, 0.5 ppb, 0.5 ppb, and 2.0 ppb <br /> respectively). <br /> The responsible party (RP) disputed the analytical results of the samples <br /> taken when the tanks were removed, stating that the samples were not } <br /> taken according to RWQCB or Department of Health Services protocol for <br /> collection of groundwater, and requested site closure based on the new <br />` data obtained and reported by their new consultant. <br /> 04/04/94 PHS/EHD reviewed file. <br /> 08/07/95 PHS/EHD decided the RP has done enough investigation, and concurred <br /> with consultant's request for closure. <br /> 08/14/95 The site is assigned to PHS/EHD Local UST Oversight Program. <br /> Notification of Responsibility letter was mailed to RP. <br /> y <br /> f <br /> h <br />