My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
455
>
3500 - Local Oversight Program
>
PR0545202
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 9:48:07 AM
Creation date
1/27/2020 9:26:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545202
PE
3528
FACILITY_ID
FA0003124
FACILITY_NAME
7-ELEVEN INC. STORE #20304
STREET_NUMBER
455
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
455 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J Work Plan for Groundwater Extraction Well Installation March 15, 1993 <br /> Southland Site No. 20304, 455 Grant Line Road, Tracy, CA 3 <br /> f <br /> grade with 1 foot of bentonite followed by a neat-cement grout containing 95 pounds of, Portland <br /> Type 1/II Cement to 5 gallons of clean water. The wellhead will be protected by a watertight locking <br /> cap and a traffic-rated street box with a watertight bolted lid until construction of the groundwater <br /> extraction system begins, at which time an appropriate accessible vault will be installed. A typical <br /> groundwater extraction well construction diagram is presented in Attachment 3. <br /> If an aquitard greater than 5 feet thick is observed below the water table in the extraction well <br /> boring, the boring will be sealed to the top of the aquitard with neat cement using a tremie pipe <br /> before setting the extraction well. <br /> k <br /> TASK 3: WELL DEVELOPMENT, SURVEYING, AND GROUNDWATER EXTRACTION <br /> Approximately 48 hours after installation, the recovery well will be rig developed using a combination <br /> of surging and balling to remove fine-grain sediments from the well and filter pack. Water from the <br /> development process will be retained on site In labeled Department of Transportation (DOT)- <br /> approved 55-gallon drums pending proper disposal. <br /> Approximately 24 hours after development, the water table will be monitored to measure static levels <br /> and the thickness of separate phase product, if present. The water-table level will be measured <br /> using an QRS Environmental Equipment INTERFACE PROBE'" Well Monitoring System, which <br /> consists of a dual optical sensor and electrical conductivity probe, that distinguishes between water <br /> and petroleum products. The top-of-casing (TOC) and horizontal position of the well will be <br /> surveyed relative to the established benchmark. The survey data will be used with the depth-to- <br /> water measurements to calculate Water-table elevation in the extraction well and to estimate the local <br /> groundwater flow direction and gradient. <br /> TASK 4: WELL PURGING, WATER SAMPLING, AND ANALYSIS <br /> Groundwater samples from the extraction well will be collected during the quarterly groundwater <br /> monitoring and sampling events conducted after installation of the well. After groundwater <br /> monitoring, 3 to 5 well-casing volumes of water will be removed from the well before sampling. A <br /> log will be maintained by the field technician that includes observations and measurements of pH, <br /> temperature, and conductivity values for the water purged. Groundwater Technology personnel will <br /> then collect groundwater samples from the extraction well. Each water sample will be analyzed for <br /> BTEX, TPH-G, TPM-D using the EPA-approved methods noted above. The work will be conducted <br /> according to Groundwater Technology's SOPs (Attachment 2). Purge water from the extraction well <br /> will be stored on site in properly labeled DOT-approved 55-gallon drums pending receipt of the <br /> groundwater sample analyses results. <br /> WP3767A1.SLL <br /> 'r _ GROUNDWATER <br /> �n__ TwiNOLOGY, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.