Laserfiche WebLink
F I� <br />�I <br /> Work Plan for Groundwater Extraction Well Installation March 15, 1993 <br /> Southland Site No. 20304, 455 Grant Line Road, Tracy, CA 4 <br /> TASK 5: REPORT PREPARATION <br /> Groundwater Technology will prepare an assessment report summarizing the data collected. The <br /> report will include descriptions of methods used, laboratory results, and site-specific graphics. <br /> Groundwater Technology is prepared to begin work on this project immediately, after approval by <br /> The Southland Corporation, the County of San Joaquin, and the City of Tracy. <br /> Please contact us at (510) 671-2387 if you have questions or comments about this Work Plan. <br /> Sincerely, <br /> Groundwater Technology, Inc. Groundwater Technology, Inc. <br /> Written/Submitted by Reviewed/Approved by <br /> andra L Lindsey Da id R. Kleesattal <br /> Project Manager Registered Geologist <br /> No.5136 <br /> i7AInD R KLI:EM TR <br /> K 5136 <br /> For: <br /> John S. Gaines <br /> Vice President, Gener8l M fi CF0� <br /> West Region <br /> SCH/SLL/DRK:nm <br /> Attachment 1 Figure <br /> Attachment 2 Groundwater Technology, Inc Standard Operating Procedures <br /> Attachment 3 Typical Groundwater Monitoring Well Construction <br /> cc: Ms. Mary Meays (San Joaquin County Public Health Services Division) <br /> WP3767A1.SLL <br /> GROUNDWATER <br /> _;fl TECHNOLOGY,INC. <br />