Laserfiche WebLink
} <br /> CURRENT ACTIVITIES <br /> e Alton Geoscience had 18 drums of soil removed on September 16, 1992, <br /> and 13 drums of purge water removed from the site on September 23, 1992. <br /> Laboratory results of soil sampling are summarized in Table 2. The official <br /> laboratory reports and chain of custody record are presented in Appendix C. <br /> RECOMMENDATIONS <br /> • Sampling of MW-13 and MW-14 be reduced from quarterly to an annually. <br /> Fluid level measurement will be continued. <br /> • Sampling of fecal coliform (F.C.) be reduced from quarterly to annually on <br /> all wells. <br /> ALTON GEOSCIENCE <br /> Tim D. { otts <br /> Project Manager <br /> r <br /> Peter C. Lange, R.G. 9 <br /> Associate, Northern California Operations <br /> k <br /> I <br /> I <br /> p <br /> I <br /> 7 <br /> Y <br /> "r <br />