My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
C E DIXON
>
6755
>
2231-2238 – Tiered Permitting Program
>
PR0543482
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 8:32:50 AM
Creation date
1/27/2020 10:28:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0543482
PE
2232
FACILITY_ID
FA0022432
FACILITY_NAME
HEINZ SEED OPERATIONS
STREET_NUMBER
6755
STREET_NAME
C E DIXON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726030
CURRENT_STATUS
01
SITE_LOCATION
6755 C E DIXON ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(E) sketch or drawing of tank including dimensions. <br /> (3) documented age of the tank system (if tank was previously used), if available, (otherwise, an estimate of the <br /> age); <br /> (4) description and evaluation of any leak detection equipment; <br /> (5) description and evaluation of any corrosion protection equipment, devices, or material; <br /> (6) description and evaluation of any spill prevention or overfill equipment; <br /> (7) description and evaluation of secondary containment for the tank system (secondary containment must meet <br /> minimum standards as specified in subsections (j)(1)through (j)(3) of this section) including applicable secondary <br /> containment for ancillary equipment as required in subsection 66265.193(f); <br /> (8) hazardous characteristics of the waste(s)that have been or will be handled; <br /> (9) prior to placing a new tank system or component in use, an independent, qualified installation inspector or an <br /> independent, qualified, professional engineer, registered in California, either of whom is trained and experienced in <br /> the proper installation of tank systems, shall inspect the system or component for the presence of any of the <br /> following items and document in writing the results of the inspection: <br /> (A) weld cracks or breaks; <br /> (B) scrapes of protective coatings; <br /> (C) corrosion; <br /> (D) any structural damage or inadequate construction or installation such as cracks, punctures, damaged fittings.All <br /> discrepancies shall be documented in the assessment and remedied before the tank system is placed in use. <br /> (10) all new tanks and ancillary equipment shall be tested for tightness prior to being placed in use.The results of <br /> the test(s) shall be documented in this assessment.Tank system integrity or leak test requirements must be in <br /> compliance with all local requirements. Prior to conducting a tank system integrity test or leak test, contact local <br /> agency staff for local requirements. <br /> (11) estimated remaining service life of the tank system based on findings of subsections (k)(1) through (k)(10). <br /> Title 22 California Code of Regulations section 66265.192(j) <br /> (1)tank system must have secondary containment capable of containing 100 percent of the contents of the tank <br /> and ancillary piping volume; and <br /> (2) if the tank system is exposed to precipitation,the secondary containment system must have sufficient capacity, <br /> in addition to that required in subsection (j)(1) of this section,to contain run-on and infiltration from a 25-year, <br /> 24-hour rainfall event; <br /> (3)tank system secondary containment shall be provided with a leak detection system that is designed and <br /> operated so that it will detect either the failure of the primary and secondary containment structure or any release of <br /> hazardous waste or accumulated liquid in the secondary containment system within 24 hours, or at the earliest <br /> practicable time if the existing detection technology or site conditions will not allow detection of a release within 24 <br /> hours. <br /> Title 22 California Code of Regulations section 66265.193(f) <br /> (f)Ancillary equipment shall be provided with full secondary containment (e.g.,trench,jacketing, double-walled <br /> piping)that meets the requirements of subsections (b) and (c) of this section except for: <br /> (1) aboveground piping (exclusive of flanges,joints,valves, and connections)that are visually inspected for leaks on <br /> a daily basis; <br /> (2)welded flanges,welded joints, and welded connections that are visually inspected for leaks on a daily basis; <br /> (3) sealless or magnetic coupling pumps and sealless valves, that are visually inspected for leaks on a daily basis; <br /> and <br /> (4) pressurized aboveground piping systems with automatic shut-off devices (e.g., excess flow check valves,flow <br /> metering shutdown devices, loss of pressure actuated shut-off devices)that are visually inspected for leaks on a <br /> daily basis. <br /> If you have any questions, please let me know. <br /> Thank You, <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.