My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_DR OM AGREEMENT 2017 JANUARY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GREAT VALLEY
>
0
>
2900 - Site Mitigation Program
>
PR0542222
>
ARCHIVED REPORTS_DR OM AGREEMENT 2017 JANUARY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 4:05:32 PM
Creation date
1/27/2020 2:25:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
DR OM AGREEMENT 2017 JANUARY
RECORD_ID
PR0542222
PE
2959
FACILITY_ID
FA0024253
FACILITY_NAME
MOUNTAIN HOUSE DEVELOPERS-SHEA HOMES
STREET_NUMBER
0
STREET_NAME
GREAT VALLEY
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
Zip
95391
CURRENT_STATUS
02
SITE_LOCATION
GREAT VALLEY PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Operations and Maintenance Plan <br /> Neighborhood C,Great Valley Parkway <br /> Mountain House,San Joaquin County,California <br /> Page 4-1 <br /> 4.0 DEED RESTRICTION REQUIREMENTS <br /> The Owner will be responsible for all Operations and Maintenance Activities. The following <br /> administrative rules shall apply: <br /> 1) The Owner shall give DTSC at least sixty (60) days of advance written notice prior to the <br /> intended date of any proposed modifications to the asphalt cap. General maintenance of <br /> slurry seal or crack filling does not constitute modifications. The written notice to DTSC <br /> shall include a detailed description of the work to be done or modifications to be made and a <br /> map showing the exact location of the proposed work and the reasons for modifications or <br /> disruption. No excavation work or soil disturbance activities shall occur directly in the <br /> Remediation System without prior approval by DTSC and the Owner. The work plan shall <br /> first be reviewed by a licensed Civil Engineer. <br /> 2) The asphalt cap shall be maintained in a manner to ensure that the public does not come into <br /> contact with the contaminated soil. Under no circumstances will the cap remain in disrepair <br /> for a period longer than ninety (90) days following discovery of damage. Further, the <br /> condition of the cap and any required maintenance shall be evaluated as part of the annual <br /> inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.