My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_DR OM AGREEMENT 2017 JANUARY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GREAT VALLEY
>
0
>
2900 - Site Mitigation Program
>
PR0542222
>
ARCHIVED REPORTS_DR OM AGREEMENT 2017 JANUARY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 4:05:32 PM
Creation date
1/27/2020 2:25:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
DR OM AGREEMENT 2017 JANUARY
RECORD_ID
PR0542222
PE
2959
FACILITY_ID
FA0024253
FACILITY_NAME
MOUNTAIN HOUSE DEVELOPERS-SHEA HOMES
STREET_NUMBER
0
STREET_NAME
GREAT VALLEY
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
Zip
95391
CURRENT_STATUS
02
SITE_LOCATION
GREAT VALLEY PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Operations and Maintenance Plan <br /> Neighborhood C,Great Valley Parkway <br /> Mountain House,San Joaquin County,California <br /> Page 5-1 <br /> 5.0 INSPECTIONS AND REPORTING <br /> Periodic inspections of the remediation system should be conducted by maintenance personnel as is <br /> normally performed for all streets and arterial roadways for Mountain House. Any repair needs to the <br /> remediation system should be conducted as soon as practicable. For any activities that will require <br /> implementation of the SMP as described in Section 9.0, reporting requirements are described in the SMP <br /> (Section 9.7). Annual inspections and reports will be conducted as follows: <br /> 1) By January 15 of each calendar year, a competent person (defined in this plan as a legal resident <br /> of California, 18 years of age or older, not found to be incompetent in a court of law, and able to <br /> interpret the terms of the deed restrictions) shall file an Annual Report of Inspections. A sample <br /> of the Annual Inspection Checklist is attached to this O&M Plan as Appendix E. The Annual <br /> Report shall be provided to the DTSC. The Annual Report, filed under penalty of perjury by the <br /> then current owner(s), shall certify that the property is being used in a manner consistent with the <br /> terms of the deed restriction and the Operation and Maintenance Agreement and describe all <br /> measures that have been taken to ensure compliance with the deed restriction's terms and the <br /> terms of the O&M Agreement. If the property owner identifies any violation of the deed <br /> restriction during an annual inspection, or any other time of year, the property owner must within <br /> 10 days of identifying the violation, determine the identity of the party in violation, send a letter <br /> advising the party of the violation of the deed restriction and a demand that the violation cease <br /> immediately. Such letter shall be sent by certified mail with return receipt and signature required. <br /> The annual report must include the dates,times and names of the competent person(s)who conducted the <br /> annual inspection. It also shall describe how observations were performed that were the basis for the <br /> statements and conclusions in the annual report (e.g., drive by, walk in, etc.). The annual report shall <br /> contain information on the integrity of the Remediation System, including asphalt cap, median, and <br /> vegetation and provide recommendation for repairs,if necessary. If the competent person notes violations, <br /> the annual report must detail the steps taken to return to compliance. Copies of any correspondence <br /> related to the enforcement of the deed restriction shall be included in the annual report but must also be <br /> sent to the DTSC within ten days of its original transmission. In addition,five year reviews <br /> 2) After five (5) years, and every five years subsequently after that, a licensed civil engineer or a <br /> licensed engineering geologist shall inspect the Remediation System. Should major repairs of the <br /> remediation system be required, then within thirty (30) calendar days after the end of the 5-year <br /> period, a competent person shall submit a remedial action review workplan to the DTSC for <br /> review and approval. Within sixty(60) days of the DTSC's approval of the workplan, the Owner <br /> shall implement the workplan and shall submit a comprehensive report of the results of the <br /> remedial action review. The report shall describe the results of all sample analysis, tests and other <br /> data generated or received by the Owner and evaluate the adequacy of the implemented remedy <br /> in protecting public health, safety and the environment. Wet signed copies of the report shall be <br /> transmitted to the list of recipients provided in Section 8.0 of this plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.