Laserfiche WebLink
TABLE OF CONTENTS <br /> ( Continued) <br /> SECTION PAGE <br /> G <br /> 6.0 INSTALLATION OF EXTRACTION AND AIR SPARGE WELLS 8 <br /> 6. 1 Drilling Permit 8 <br /> 6.2 Groundwater Extraction Well Installation 8 <br /> 'r 6.2. 1 Drill a Boring for the Installation of a Groundwater <br /> Extraction Well 8 <br /> 6.2.2 Groundwater Extraction Well Construction 9 <br /> {E 6. 3 Air Sparge Well Installation 9 <br /> 6.3 . 1 Drill a Boring For the Installation of aa) Air <br /> { Sparge Well 9 <br /> 6.3 .2 Air Sparge Well Construction 10 <br /> 6 .4 Vapor Extraction Well Installation 10 <br /> k 6.4. 1 Drill Borings for the Installation of Vapor <br /> Extraction Wells I1 { <br /> 6.4.2 Vapor Extraction Well Construction 11 <br /> 6 .5 Soil Sample Analysis 12 <br /> 7 .0 GROUNDWATER ELEVATIONS 12 <br /> } 8 .0 FEASIBILITY TESTS 12 <br /> 8 . 1 Step Drawdown Pumping Test 13 <br /> 8 .2 Constant Rate. Pumping test 1 3 <br /> 8 . 3 Vapor Extraction Test 14 <br /> 8 .4 Air Sparging Test 1. 6 <br /> r <br />