My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002242
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
3500 - Local Oversight Program
>
PR0545205
>
ARCHIVED REPORTS_XR0002242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 3:41:16 PM
Creation date
1/27/2020 3:19:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002242
RECORD_ID
PR0545205
PE
3528
FACILITY_ID
FA0003164
FACILITY_NAME
NORTH POLE GAS & FOOD INC
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q <br /> TABLE OF CONTENTS <br /> (Continued) <br /> 4 � <br /> SECTION <br /> PAGE <br /> 6.0 INSTALLATION OF EXTRACTION AND AIR SPARGE WELLS g <br /> 6. 1 Drilling Permit 8 <br /> 6.2 Groundwater Extraction Well Installation 8 <br /> 6.2. 1 Drill a Boring for the Installation of a Groundwater <br /> z Extraction Well 8 <br /> 6.2.2 Groundwater Extraction Well Construction 9 <br /> {{ 6 .3 Air Sparge Well Installation 9 <br /> 4` 6.3. 1 Drill a Boring For the Installation of an Air <br /> f Sparge Well 9 <br /> I 6.3 .2 Air Sparge Well Construction 10 <br /> 6.4 Vapor Extraction Well Installation 10 <br /> 3 <br /> f <br /> 6.4. 1 Drill ;Borings for the Installation of Vapor <br /> Extraction Wells 11 <br /> i 6.4.2 Vapor Extraction Well Construction 11 <br /> 6.5 Soil Sample Analysis 12 <br /> 7 .0 GROUNDWATER ELEVATIONS 12 <br /> 8 .0 FEASIBILITY TESTS 1 2 <br /> 8 . 1 Step Drawdown Pumping Test 13 <br /> 8 .2 Constant Rate Pumping test 13 <br /> 8 . 3 Vapor Extraction Test 14 <br /> I 1 <br /> 8 .4 Air Sparging Test 16 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.