Laserfiche WebLink
placed above the filter pack, and a neat cement slurry will then be backfilled to the ground <br /> surface. A well construction diagram is included as figure 3. <br /> The monitoring wells will be developed following installation, and each will be surveyed <br /> and sounded to determine the local groundwater gradient. Drill cuttings and <br /> decontamination water generated during the well construction activities will be-temporarily <br /> RMS � <br /> stored'on site in sealed, 55-gallon drums pending receipt of analytical results. Once <br /> analytical results are received, the drums will be disposed of at the proper facility. <br /> 1 <br /> If you have any questions regarding this work plan, please contact me at (408) 224-4724. j <br /> Sincerely, <br /> KHM Environmental Management, Inc. <br /> Ve a Fischer <br /> Staff Geologist <br /> Attachments: <br /> Figure I Site Location Map <br /> Figure 2 —Site Map <br /> Figure 3 —Well Construction Diagram <br /> RM Attachment A—Health and Safety Plan—"D+ <br /> Attachment B—Property Owner;Authorization Letter <br /> RMI T <br />