My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002147
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
6700
>
3500 - Local Oversight Program
>
PR0545213
>
ARCHIVED REPORTS_XR0002147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 5:09:35 PM
Creation date
1/27/2020 4:51:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002147
RECORD_ID
PR0545213
PE
3528
FACILITY_ID
FA0005338
FACILITY_NAME
J B TERMINAL CO
STREET_NUMBER
6700
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
6700 GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All site activities involving potential contact with <br /> . , hazardous materials ( i.e. gasoline contaminated soils ) will <br /> be conducted in accordance with Waterwork ' s Health and <br /> Safety Plan (Appendix III ) . A problem assessment report <br /> will be prepared according the RWQCB guidelines summarizing <br /> the findings of the investigation and recommending remedial <br /> action alternatives, as appropriate. The fief ., <br /> investigation will be conducted under the direct supervision <br /> of Russell W. Juncal, California Registered Geologist No. <br /> 3864 and/or Nora H. Kataoka, California Registered Civil <br /> Engineer No. 38322. The appropriate individual will review <br /> and sign the assessment report. <br /> Following agency approval the estimated time necessary to <br /> complete the tasks proposed in this workplan is 10 weeks. <br /> Following agency approval, the distribution of tasks over <br /> this time period is clown below. Actual time may vary <br /> �> depending c- drill rig availability, laboratory turn-around <br /> and unforeseen circumstances. <br /> GEEK <br /> ITEM <br /> ———— -------------------- <br /> y ,_--_...— _—_—____—_.._---- tea"--" i-- z 2 4 5 6 7 d 9 10 <br /> Agency Approval + <br /> sMobiliaatxon/Permits <br /> }+w <br /> Sail boring/ <br /> wail IrateIIatian <br /> } <br /> surveying <br /> z <br /> 4 ' soil Analysis <br /> f R+ <br /> Well Development/ <br /> water sampling <br /> wr•+w+•r•rww <br /> Water Analysis <br /> +rrwweraw+*r+wr+*• <br /> e <br /> internal Review/ <br /> Report Preparation <br /> Report Submittal <br /> to Agency <br /> r <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.