Laserfiche WebLink
SITE SAFETY PLAN, JOB #4300.701 <br /> GENERAL INFORMATION <br /> SITE Company BP Oil Company <br /> Location 1469 Hammer Lane, Stockton, California <br /> PLAN PREPARED BY: GeoStrategies Inc., 9/22/94 <br /> OBJECTIVES To provide a safety plan for the safe completion <br /> of the site work. <br /> EFFECTIVE DATES 9/26/94 through 12/31/94 <br /> SUMMARY hazardous material may be present, caution is <br /> advised Site work includes clearing of <br />• underground utilities, drilling of three exploratory <br /> soil borings to assess potential hydrocarbon <br /> migration <br /> SITE WASTE CHARACTERISTICS <br /> WASTE TYPE(S) Solids (drill cuttings) <br /> Liquids (steam cleaning rinsate) <br /> CHARACTERISTIC(S) Volatile, combustible, tort <br /> FACILITY. Active service station <br /> HAZARD EVALUATION <br /> PARAMETER TLV 304 ppm organic vapors, as measured in <br /> the breathing zone with a photoionization <br /> detector <br /> HEALTH CONCERNS Ingestion, inhalation, adsorption <br /> GeoStrategies Inc. <br /> p <br />