My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:29:39 PM
Creation date
1/29/2020 11:41:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002004
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•I ; <br /> Site Safety Plan #4300 701 <br /> September 23, 1994 <br /> PRECAUTIONS Correct safety procedures shall be followed, per <br /> GeoStrategies Inc. Health and Safety Pian <br /> SITE SAFETY WORKPLAN• <br /> PERIMETER PROTECTION Traffic cones <br /> PERSONAL PROTECTION EPA Level D <br /> Modifications latex gloves and hard hats <br /> Safety vests are to be worn at all times <br /> Surveillance equipment PID <br /> DECONTAMINATION. Personal wash thoroughly with detergent <br /> solution and water <br /> EauiQment wash thoroughly with detergent <br /> solution and water, or steam clean <br /> FIRST AID As applicable At least one member of crew will <br /> have current first aid/CPR certification <br /> WORK LIMITATIONS None <br /> INVESTIGATION-DERIVED <br /> MATERIAL DISPOSAL All soil cuttings will be stockpiled on plastic <br /> sheeting at the site until disposal Stockpile will <br /> be covered at the completion of each day <br /> Decontamination rinsate will be stored in <br /> approved storage containers (drums) until <br /> disposal <br /> TEAM COMPOSITION <br /> Foreman/Safety Officer GSI <br /> Subcontractor Drilling subcontractor <br /> EMERGENCY Ambulance 911 <br /> Fire Department 911 <br /> Sheriff/Highway Patrol 911 <br /> 2 <br /> GeoStrategies Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.