My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:07:00 PM
Creation date
1/29/2020 11:49:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002016
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Supplemental Investigation Work Plan <br /> BP Site No 11191 <br /> C A M B R I A Stockton, California <br /> June 21, 2002 <br /> Groundwater Monitoring Activities <br /> Each quarter, groundwater samples will be collected from selected site wells and analyzed for <br /> TPHg by modified EPA Method 8015, and BTEX, and MTBE by EPA Method 8021 <br /> Groundwater monitoring activities will be described under separate cover <br /> SCHEDULE <br /> Upon SJCPHS approval of this Work Plan, access agreements and permit applications will be <br /> submitted and field activities will be scheduled Supplemental Investigation Report submittal is <br /> anticipated for 6 to 8 weeks after field activities are completed Quarterly monitoring reports will <br /> be submitted separately <br /> ATTACHMENTS <br /> • <br /> Figure 1 —Vicinity Map <br /> Figure 2—Site Plan <br /> Appendix A—Standard Field Procedures for Installation of Monitoring Wells <br /> \\1OAKDUR\Bntish Petmlcumll l 19l-East Hammer Stocktonlsupplcmental Investigation Work Plan\1 1191 Supplemental Investigation Work Plan doc <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.