Laserfiche WebLink
Task 3 - Well Development and Sampling <br /> The new wells will be developed using a bailer or suitable pump. Development will be conducted <br /> for about 2 to 3 hours or until the water is relatively sediment free. Development water will be <br /> contained in 55-gallon drums that will be stored in an area designated by site management. <br /> Following development,the wells will be sampled using a Teflon bailer. Samples will be decanted <br /> from the bailer into appropriate sample containers, labeled, and placed in a cooled container for <br /> transport to the laboratory under chain-of-custody control. Sampling equipment will be cleaned <br /> prior to sampling. <br /> Samples will be analyzed for volatile organic compounds (VOCs)using EPA Method 8240. <br /> Task 4 - Report Preparation <br /> Within two weeks of receiving the analytical results, we will submit a report describing the <br /> investigation and results of the laboratory analyses. Ground water analysis will be submitted under <br /> one week turnaround and verbal results will be provided as soon as they are available. <br /> Should you have any questions or require additional information,please do not hesitate to contact <br /> me. <br /> Sincerely, <br /> Harza Consulting Engineers and Scientists <br /> �� C . `�%q, <br /> Tacia Miller <br /> Project Engineer <br /> TM:gg\encl. <br /> Copies: Michael Donovan,Esq.(Zevnik,Horton,Gibord&McGovern,P.C.- 1) <br /> Ms.Linda Turkette(San Joaquin County Public Health Services- 1) <br /> L198-G proj=Utr\29312 <br /> 07-12-95 2 I /AA` <br /> rL�^ <br />