r • • <br /> ALTERNATIVE 5 <br /> r GEOMATRIX <br /> LIMITED EXCAVATION OF ON-SITE SOIL FOR OFFSITE DISPOSAL <br /> PRELIMINARY COST ESTIMATE <br /> Former ContiGroup Grain Elevator Page 2 of 2 <br /> r1805 Harbor Street <br /> Stockton, Caltfornta <br /> r TASK <br /> ACTIVITY QUANTITY UNIT UNIT$ COST$ SUBTOTAL$ <br /> DEWATERING and TREATMENT SYSTEM(cont'd) <br /> Other mise 65,000 <br /> treatment system installation,startup,operations 30 day 1,500 45,000 <br /> laboratory analysis of discharge water samples 8 event 500 4,000 <br /> r system decommissioning 1 lump sum 10,000 10,000 <br /> spent GAC pickup and disposal 1 lump sum 6,000 6,000 <br /> DEWATERING and TREATMENT SYSTEM SUBTOTAL S 135,000 <br /> . TASK <br /> ACTIVITY QUANTITY UNIT UNIT$ COST$ SUBTOTAL$ <br /> r EXCAVATION and BACKFILL <br /> Pre-field activities 83,000 <br /> stormwater controls installed 1 lump sum 10,000 10,000 <br /> design shoring 1 lump sum 10,000 10,000 <br /> remove concrete slab and recycle debris I lump sum 10,000 10,000 <br /> decommission existing monitoring wells 4 ea 5,000 20,000 <br /> remove 4,500-feet2 AC&recycle 1 lump sum 20,000 20,000 <br /> r remove overhead powerline&pole 1 lump sum 8,000 8,000 <br /> pre-profile soil waste 1 lump sum 5,000 5,000 <br /> excavation 996,900 <br /> r mob/demo 1 lump sum 15,000 15,000 <br /> install and remove shoring 1 lump sum 275,000 275,000 <br /> excavate 2,650 cy overburden soil and stockpile 2650 cubic yard 12 31,800 <br /> '1 excavate 5,300 cy affected soil 5300 cubic yard 15 79,500 <br /> offsite transportation and disposal of affected soil 9000 ton 42 378,000 <br /> locate and test source of backfill soil 1 lump sum 5,000 5,000 <br /> sample and test stockpiled overburden soil 25 ea 250 6,250 <br /> move,place,and compact overburden soil 2650 cubic yard 9 23,850 <br /> import fill purchase,transport,place,compact 8500 ton 20 170,000 <br /> import baserock purchase,transport,place,compact 500 ton 25 12,500 <br /> r Other mise 52,500 <br /> field work oversight and coordination 15 days 1,500 22,500 <br /> mise field equipment 1 lump sum 5,000 5,000 <br /> replace utility pole and power line I lump sum 10,000 10,000 <br /> rreplace AC pavement 4,500-ft2 1 lump sum 15,000 15,000 <br /> EXCAVATION and BACKFILL SUBTOTAL S 1,132,400 <br /> TASK <br /> ACTIVITY QUANTITY UNIT UNIT$ COSTS SUBTOTAL$ <br /> 15%nroiect manaeern_Ent cost 0 15 1,312,400 196,900 <br /> 20%contingency cost 02 1,312,400 328,100 <br /> TOTAL $ 1,837,400 <br /> 10oc_Saw9000s199631CAP1App9 Alternatives As 10/6120049 52 AM <br />