| ALTERNATIVE 6    					GEOMATRIX
<br />      .     	COMPLETE EXCAVATION FOR ONSITE LOW-TEMPERATURE THERMAL DESORPTION
<br />  								PRELIMINARY COST ESTIMATE
<br />    								Former ContiGroup Grain Elevator 					Page 1 of 3
<br />      									1805 Harbor Street
<br />      									Stockton, California
<br />  '  	Assumptions
<br />		1   Extent of excavation encroaches on two dead-end railroad tracks  Both spurs will be closed temporarily for track removal excavation
<br />    		and backfill,and track replacement
<br />  '  	2   Excavation area is approximately 11,300-ft2(I 10-ft x 140-ft)  The top 10-ft of overburden soil to be removed,stockpiled,and tested
<br />    		Overburden soil(4,200 cy)assumed to be non-hazardous and used to backfill excavation  Excavation depth is 30-feet bgs and affected
<br />    		soil volume is approximately 8,400 cubic yards(14,200 tons @ 125 lbs/ft3 density)
<br />		3   Excavation will be shored for 30-feet deep soil removal
<br />		4   Groundwater depth approximately 12-ft bgs  No buried utilities assumed
<br />		5   Existing 14-ft x 20-ft concrete pad to be removed  Assumed 6-inch thickness  Concrete debris estimated at 12 5 tons to be recycled
<br />		6   Existing asphalt pavement(4,500-ftz)to be removed  Assumed 9-inch thickness  Disposal of asphalt debris at local rec)cle facility
<br />		7   No confirmation sampling of excavation
<br />		8   Shored excavation will be dewatered during excavation and backfill  Assume dewatering extraction rate of approximately 25 gallons per
<br />  '
<br />  			e
<br />       	9   The The extracted water will be piped to a treatment system consisting of two 2,000-pound carbon units arranged in series,pumps,sand
<br />    		filter,holding tanks,water-level controllers,piping,and manifold  The treated water would be discharged to a City sewer with permit
<br />		10  Excavated soil affected by hydrocarbons will be treated on-site using low-temperature thermal desorption(LTTD)  Treated soil will be
<br />    		stockpiled on-site for replacement as backfill  Significant area of facility will be required for treating and stockpiling soil
<br />		11  12-inches of aggregate base rock to be placed and compacted to 95%relative compaction for pavement base
<br />		12  Top 10-ft of stockpiled overburden soils to be sampled and analyzed for TPH-diesel and TPH-gasoline One composite sample per 100
<br />    		cy Of soil
<br />  '  	13  The conceptual design for this alternative(dewatering,carbon treatment system,demo,shoring,excavation,and re-construction)was
<br />    		developed for cost analysis purposes only,additional evaluations will be necessary for the final system design if this alternative Is
<br />    		implemented
<br />		14  No air monitoring required
<br />		15  No dust control or vapor suppressant required
<br />		16  Municipal water supply available on-site
<br />       	Notes
<br />       	The following costs were estimated based on a conceptual design of the remedial action and readily available cost information on labor and
<br />       	material typical for similar projects  The actual costs for this project may vary depending on the final design,contract bids,agencies'
<br />       	requirements,and/or the availability of equipment,materials,and/or contractors at the time of final remedial action design,construction,
<br />       	and/or implementation
<br />       	ACTIVITY  															TASK
<br />  '     									QUANTITY     UNIT     UNIT$     COST$      SUBTOTAL$
<br />       	PLANNING and PREPARATION
<br />       	pre-held activities 															135,000
<br />       	utility protection design&approval     				1 	lump sum       15,000 	15,000
<br />       	stormwater permit       						1  	lump sum	5,000  	5,000
<br />       	properties access agreements     					1  	lump sum       25,000	25,000
<br />  '  	workplan-excavation,demolition,stormwater,disposal 		1  	lump sum       75,000 	75,000
<br />       	surveying								1  	lump sum       15,000 	15,000
<br />       	PLANNING and PREPARA TION SUBTOTAL     									$   	135,000
<br />       	DEWATERINGand TREATMENTSYSTEM
<br />  ' 	nre-field activities   															32,000
<br />       	city encroachment permit						1  	lump sum       10,000 	10,000
<br />       	city sewer discharge permit      					1  	lump sum       10,000 	10,000
<br />       	design treatment system,procure equipment    			100    	hr      	100 	10,000
<br />       	underground utility locator      					1  	lump sum	2,000  	2,000
<br />       	instal!goLatering treatments stem 													49,000
<br />       	install piping,Instrumentation,electrical controls			1  	lump sum       20,000	20,000
<br />       	dewatering pumps       						2     	ea    	3 000  	6,000
<br />       	transfer pump    							1     	ea    	1,000  	1,000
<br />       	fuel or electricity for pumps      					I     	ea    	3,000  	3,000
<br />       	rental of holding tanks   						I  	lump sum       10,000 	10,000
<br />  ' 	carbon system(2 pairs of 2,000-pound GAC)    			I  	lump sum	9,000  	9,000
<br />  '    	10oc_Safe\9000s19963\CARAppB Altematves xis    											10/6/20049 52 AM
<br /> |