Laserfiche WebLink
Tn Regional Recommendation Page 6 of 24 <br /> Appendix A <br /> Note To satisfy Basin PIan requirements and <br /> Resolution No 88-63,which states in part" • Copies of drillers and/or geologist logs for <br /> all surface and ground waters of the State are drilling and construction <br /> considered to be suitable, or potentially suit- <br /> able, for municipal or domestic water sup- • Appropriate field notes from well develop- <br /> ply "see Table 1, for a list of Numerical ment with descriptions of parameter stabili- <br /> Water Quality Limits for Petroleum Based zation (e g tables showing pH, electrical <br /> Fuel components for protection of existing conductivity, temperature,turbidity, devel- <br /> or potential sources of drinking water opment method,and volume of groundwater <br /> purged from the well) <br /> These Limits change from time-to-time The <br /> current list of numerical limits may be found Type of drilling rig equipment used for well <br /> on the internet at construction,names of the driller and super- <br /> http//www swrcb ca gov/rwgcb5/available_ vising field geologist, plus any difficulties <br /> documents/index html#WaterQualityGoals encountered during drilling that could affect <br /> the future quality of data from the well <br /> � Appropriate conclusions, and recommenda- <br /> tions for additional work, as necessary Workplans and summary reports are to be prepared <br /> and submitted to the LIA and Regional Board until <br /> Monitoring well diagrams are to represent the the lateral and vertical extent of contamination is <br /> completed well and show or describe the fol- defined The proposed additional work may be <br /> lowing submitted separately, or with the quarterly status <br /> reports <br /> • An accurate depiction of monitoring well <br /> construction Please note that site conditions may warrant in- <br /> terim cleanup and removal_actions before the lat- <br /> Types and quantities of materials placed in eral and vertical extent of contamination is <br /> the borehole completely defined For interim remedial <br /> actions, the discharger„shall follow the <br /> Placement method of the annular seal mate- requirements outlined in the UST Regulations, <br /> rials, (e g pumped through a tremie pipe, or U722(b) <br /> poured from the surface) <br /> Location of screen interval, transition seal, <br /> and sanitary seal details <br /> Nominal inner diameter(ID) and outer di- <br /> ameter(OD)of the auger and casing <br />